
Industrial UPS Supplier
UniRegal supplies industrial UPS systems for PLC panels, SCADA, process control, utilities and critical automation loads. Configure UPS capacity, runtime, battery, bypass, monitoring and enclosure requirements.
Solutions
Explore UPS systems, electrical enclosures, and electrical cabinet solutions designed to support industrial projects from specification to delivery.

UniRegal supplies industrial UPS systems for PLC panels, SCADA, process control, utilities and critical automation loads. Configure UPS capacity, runtime, battery, bypass, monitoring and enclosure requirements.

UniRegal supplies IP65/IP66 and NEMA 4X control cabinets from our Foshan multi-supplier network. Carbon steel, 304 or 316 stainless, with cooling and cable entry pre-fitted. MOQ 5 units, ~15-day build.
Foshan-based supplier and sourcing partner for control panels, enclosures and industrial UPS shipped to Malaysia. MS IEC 61439 builds, SIRIM-certified components, FAT before shipment.
Foshan supplier of washdown-duty food processing control panels: 304/316L stainless, IP66 to IP69K, sloped-top builds with food-grade gaskets. Complete panels from 1 unit; empty enclosures from 5.

Custom sheet-metal enclosures to your drawings - communication racks, power cabinets, battery cabinets, 1U/2U chassis. Laser-cut, powder-coated, tolerance-controlled.

Foshan control panel build service: you supply the core devices, we supply enclosure, PSU, terminals and protection, then assemble, wire, label and FAT test the panel.

Tray-type, ladder-type and slot-type cable trays in galvanized, hot-dip or stainless finishes. Power and control cabling for industrial and infrastructure projects.

Dense insulated busway, 3-phase 3/4/5-wire, 50-60 Hz, up to 400 V, rated 400-6300 A. Compact trunking from transformer to switchgear.

Distribution boxes, meter boxes and site temporary-power boxes - surface-mount, flush-mount or outdoor. 220 V single-phase / 380 V three-phase, 50 Hz.

Factory LV switchgear: drawer-type MNS, GCS and GCK motor-control and power centers plus fixed GGD boards, 380-660 V, 50 Hz, main bus to 6300 A.