
PLC Control Panel Supplier & Integration Partner
PLC panels built around Mitsubishi, Siemens or ABB — enclosure, I/O, wiring, labeling, drawings and functional testing as a sourcing and integration partner.
CONTROL SYSTEMS FOR INDUSTRIAL APPLICATIONS
Explore control panel solutions designed for machinery, water treatment, HVAC, manufacturing, infrastructure, and industrial automation projects. Available in PLC, MCC, pump control, and custom-built configurations to simplify integration, improve reliability, and reduce commissioning delays.
INDUSTRIAL AUTOMATION
Explore engineered control panel solutions developed for machinery, utilities, infrastructure, manufacturing, and process automation projects.

PLC panels built around Mitsubishi, Siemens or ABB — enclosure, I/O, wiring, labeling, drawings and functional testing as a sourcing and integration partner.

Foshan-based supplier and sourcing partner for control panels, enclosures and industrial UPS shipped to Malaysia. MS IEC 61439 builds, FAT before shipment.

Washdown-duty food processing control panels: 304/316L stainless, IP66 to IP69K, sloped-top builds. Complete panels from 1 unit; empty enclosures from 5.

Foshan control panel build service: you supply the core devices, we supply enclosure, PSU, terminals and protection, then assemble, wire, label and FAT test.

Custom industrial automation panels for machinery, utilities, water treatment and process control. Configure PLC, HMI, VFD, I/O and enclosure rating.

UniRegal supplies IP65/IP66 and NEMA 4X control cabinets through our Foshan multi-supplier network—carbon steel, 304, or 316 stainless.