Solutions

Industrial Electrical Solutions

Explore UPS systems, electrical enclosures, and electrical cabinet solutions designed to support industrial projects from specification to delivery.

All products
34 products
Food Processing Control Panels
Process Control Panels

Food Processing Control Panels

Washdown-duty food processing control panels: 304/316L stainless, IP66 to IP69K, sloped-top builds. Complete panels from 1 unit; empty enclosures from 5.

View product
qag0cf.png
Industrial UPS

Industrial UPS Supplier

Industrial UPS systems for PLC panels, SCADA, process control and critical automation loads. Configure capacity, runtime, battery, bypass and monitoring.

View product
0jfp4k.jpg
Machinery Control Panels

Machinery Control Panel Supplier

Custom machinery control panels for OEM equipment, automated production machines and retrofit projects. Send sequence, voltage, I/O list and safety functions.

View product
56ldqj.png
HVAC Control Panels

HVAC Control Panel Supplier

Custom HVAC control panels for AHUs, ventilation fans, pumps, cooling towers and chiller plants. Send sequence, motor schedule, sensors and BAS/BMS points.

View product
78t7mn.png
Power Distribution Panels

Power Control Panel Supplier

Custom power control panels for protected distribution, switching, metering, alarms and interlocks. Send load schedule, SLD, fault current and FAT scope.

View product
02oq1m.jpeg
Oil & Gas Control Panels

Oil & Gas Control Panel Supplier

RTU and well-site control panels for harsh sites: IP65 or NEMA ratings, customer-supplied components, FAT records and as-built drawings before shipment.

View product
Page 1 of 3