0jfp4k.jpg
rsc3fz.png
tvu4xa.png
Machinery Control Panels

Machinery Control Panels

Custom panels for OEM equipment and industrial machines

Specifications

Application
Customizable
Voltage
Customizable
Protection Rating
Customizable
Communication Protocol
Customizable
Testing
FAT Available
Customization
Available


Machinery Control Panels

Custom Control Panels Built for Reliable Machine Operation

Custom-built machinery control panels designed for OEM equipment manufacturers, industrial automation systems, and global machine projects where stable startup, reliable operation, and long-term maintainability matter.

Machinery Control Panels for OEM Equipment & Industrial Automation

From packaging machines to conveyor systems and CNC equipment, we build custom machinery control panels designed to reduce startup delays, simplify integration, and improve long-term operational stability.
  • PLC, HMI, and VFD Integrated
  • Multi-Brand Automation Support
  • Tested Before Shipment
  • Built for Global Voltage Standards
  • Custom Wiring & Documentation Support

Overview

A machinery control panel is not just an electrical box.
In real industrial environments, the control panel directly affects whether a machine can start smoothly, communicate correctly, and operate reliably under actual production conditions.
At UniRegal Automation, we build custom machinery control panels for OEM manufacturers, industrial equipment builders, and automation projects that require stable control performance and practical field reliability.
Our engineering team focuses not only on component assembly but also on real operational challenges such as the following:
  • PLC and HMI communication compatibility
  • VFD interference and unstable signals
  • Cabinet heat buildup
  • Wiring clarity for maintenance teams
  • Voltage differences between countries
  • Expansion flexibility for future upgrades
  • Reliable startup after on-site installation
This approach helps customers reduce commissioning problems and improve long-term machine stability.

Common Problems We Help Solve

Many machinery projects experience delays not because the machine design is wrong but because the control system was not properly prepared for real factory conditions.
Typical problems include the following:
  • Machines unable to start after arriving on site
  • Communication failure between PLC, HMI, and drives
  • Unclear wiring causing troubleshooting difficulties
  • Poor cabinet ventilation leading to overheating
  • Incorrect voltage configuration for export markets
  • Difficult maintenance due to disorganized layouts
  • Long downtime caused by replacement incompatibility
Our control panels are designed with these real-world risks in mind.

Applications

Our machinery control panels are widely used in:
  • Packaging machines
  • Conveyor systems
  • CNC equipment
  • Assembly lines
  • Material handling systems
  • Water treatment equipment
  • HVAC automation systems
  • Food processing machinery
  • Industrial production lines

Key Configurations

Electrical Specifications

  • Voltage: 110V / 220V / 380V / 415V / Custom
  • Frequency: 50Hz / 60Hz
  • Single-Phase or Three-Phase

Control Systems

  • PLC Control Systems
  • HMI Integrated Systems
  • Relay Logic Panels
  • VFD Drive Control
  • Servo Motion Control

Protection & Enclosure

  • IP20 / IP54 / IP65
  • Powder-Coated Steel Enclosures
  • Stainless Steel Enclosures
  • Indoor & Outdoor Configurations

Supported Automation Brands

We support multi-brand automation integration based on project requirements, including:
  • Siemens
  • Mitsubishi
  • Omron
  • Schneider Electric
  • ABB
  • Allen-Bradley
  • Delta
  • Weintek
  • Kinco
We also help customers solve compatibility issues between different automation platforms during upgrades or machine retrofits.

Engineering & Project Support

Our support goes beyond panel assembly.
We assist customers throughout the entire project process:
  • Component selection
  • Electrical schematic review
  • Panel layout optimization
  • PLC/HMI integration
  • Wiring and labeling
  • Functional testing
  • Export packaging
  • Remote technical support
For OEM projects, we can also support standardized panel production for repeated machine builds.

Quality Assurance

Every machinery control panel undergoes full inspection and testing before shipment.
Our testing process typically includes:
  • Wiring inspection
  • Terminal verification
  • Power-on testing
  • PLC/HMI communication testing
  • I/O functional testing
  • Voltage verification
  • Safety inspection
This helps reduce installation risks and startup problems during commissioning.

Why Customers Choose UniRegal Automation

Practical Engineering Experience

We understand the difference between a control panel that looks good and one that operates reliably inside a real factory.

Multi-Brand Integration Capability

Many industrial projects involve mixed automation platforms. We help simplify integration between different brands and systems.

Faster Project Communication

Our team supports technical discussions, documentation confirmation, and project coordination for international customers.

Focus on Long-Term Maintainability

We pay attention to wiring clarity, component accessibility, heat management, and future maintenance convenience.

RFQ – Request for Quotation

To receive a faster and more accurate quotation, please provide:
  • Machine type or application
  • Required automation brands
  • Voltage and power requirements
  • I/O requirements
  • Quantity
  • Project timeline
  • Technical drawings or specifications
Our engineering team will review your requirements and respond within 24 hours.

Frequently Asked Questions

Can you customize the control panel based on our machine requirements?

Yes. All machinery control panels can be customized based on your voltage, control logic, PLC brand, I/O requirements, installation environment, and machine application.

Do you support Siemens, Mitsubishi, and other PLC brands?

Yes. We support Siemens, Mitsubishi, Omron, Schneider, ABB, Allen-Bradley, Delta, and other industrial automation brands depending on project requirements.

Can the panels be used for export projects?

Yes. We build panels based on different international voltage standards and project requirements for overseas markets.

Do you test the control panels before shipment?

Yes. Every panel undergoes wiring inspection, functional testing, communication testing, and power-on verification before delivery.

Can you help with panel upgrades or retrofit projects?

Yes. We can help replace outdated systems, upgrade PLC platforms, improve wiring layouts, and optimize existing control systems.

Contact Us

Looking for a reliable machinery control panel supplier for your industrial project?
Contact UniRegal Automation today.