
Outdoor Cabinets (IP65/IP66)
IP65 IP66 Outdoor Electrical Cabinet Supplier
IP65 and IP66 outdoor electrical cabinets for control panels, power distribution, meters and industrial equipment. Compare ratings, materials and cooling, and source from Foshan suppliers.
Specifications
- Material
- Carbon Steel / Stainless Steel
- Protection Rating
- IP54 / IP65 / IP66 Optional
- Mounting Type
- Wall Mount / Floor Standing
- Surface Finish
- Powder Coated
- Application
- Industrial Use
- Customization
- Available
IP65 and IP66 Outdoor Electrical Cabinets for Industrial Equipment
UniRegal supplies outdoor electrical cabinets for control panels, power distribution, meters, telecom equipment, pump stations, utilities, and industrial automation equipment.
Outdoor cabinets must manRecent Projects (Anonymous)
Real deliveries through our Foshan sourcing network. Client names withheld by request.
Project Example — Outdoor IP66 Meter & Distribution Cabinet, 2026
Photo placeholder — to be added (Foshan delivery evidence, 2026).
- Scope: 3× outdoor cabinets for a solar farm — metering, string combiner and distribution in one weatherproof body.
- Panel: IP66 316 stainless, polyurethane-gasketed door, UV-stable coating, cable glands.
- Country: Australia.
Engineering Review Example
Customer Requirement: Cabinets exposed to full sun and rain for 10+ years; the previous batch leaked at the door within two seasons.
Our Suggestion: Move from IP65 to IP66, use a poured polyurethane gasket (not foam tape), and add a drip skirt above the door seam.
Final Design: IP66 316 body, PUR-gasketed door, drain holes + breather, FAT included a hose-down check at the seam before shipment.
Why Choose UniRegal for Outdoor Cabinets
- IP65 vs IP66 specified by duty — we don't oversell a rating you don't need, or underspec one you do.
- Foshan multi-supplier sourcing — enclosure + internal gear sourced together.
- MOQ 5 units, ~15-day build; components ship in 3–5 days.
- Material honesty — 304 / 316 / galvanized by exposure, not by default.
- FAT before shipment — seal check, photos on request.
Lead Time & FAT
Item | Lead time |
|---|---|
Enclosure / cabinet | ~15 days |
Internal components | 3–5 days |
FAT + inspection | Before shipment, photos available |
FAQ — Outdoor Cabinets
Q: IP65 or IP66 for outdoors?
A: Sheltered / occasional spray → IP65. Direct rain, hose-down, full sun → IP66 with a PUR gasket. We spec by exposure.
Q: 304 or 316 stainless outside?
A: Coastal or chemical → 316. Inland dry → 304 is enough. Galvanized is an option for non-food duty.
Q: How do you prove the seal holds?
A: FAT includes a seam check; for outdoor builds we can run a hose-down verification on request.
Applicable Industries
Solar & renewables, telecom, water, traffic, outdoor metering, remote sites.
Request Engineering Review
Have an enclosure drawing or duty spec? Upload it → we return an engineering review + quotation in 1–2 working days.
Request Engineering Review →age rain, dust, sunlight, heat, condensation, cable entry, corrosion, and maintenance access. The correct design depends on the site, not only the IP label.
Information to Send Before Quotation
- cabinet dimensions, drawing, or target equipment layout;
- required IP65, IP66, or NEMA rating and outdoor exposure condition;
- material and surface finish;
- cooling method, condensation control, and cable entry direction;
- canopy, plinth, base, wall, or pole mounting requirements;
What UniRegal Can Deliver
UniRegal can deliver outdoor cabinet fabrication, powder coating or stainless steel construction, backplate preparation, cutouts, gland plates, canopies, plinths, labels, packing, and agreed inspection records.
FAQ
What information is needed for the quotation?
Send drawings or sketches, dimensions, material, IP rating, mounting style, cable-entry direction, accessory requirements, quantity, and installation environment.
Can UniRegal build from customer drawings?
Yes. Build-to-print enclosure orders are practical when drawings, material, finish, tolerances, and inspection points are agreed upon before production.
Can custom cutouts and labels be included?
Yes. HMI, push button, meter, lock, hinge, gland, ventilation, and label requirements can be produced according to approved drawings.
Can UniRegal support repeat OEM orders?
Yes. Repeat batches can be produced from approved drawings so dimensions, mounting holes, and accessories remain consistent.
How should material be related to solutions & guides?
- Stainless steel enclosures
- IP65 vs IP66 explained
Specifying outdoor enclosures? We source IP65/IP66 cabinets in carbon steel or 304/316 stainless from Foshan suppliers, with cooling built in. Talk to our team about your project.e selected?
Carbon steel is common for indoor industrial use. Stainless steel is preferred for corrosion, washdown, coastal, food, chemical, or outdoor environments.
Request a Quote
Send drawings, dimensions, material, and IP rating requirements for an enclosure quotation.
Related Guides & Solution Centers
Specifying an outdoor cabinet? Request an engineering review.From our Foshan supplier network — these photos show typical enclosure fabrication and panel-assembly steps carried out by our inspected production partners.



