njwb7n.png
Outdoor Cabinets (IP65/IP66)

IP65 IP66 Outdoor Electrical Cabinet Supplier

IP65 and IP66 outdoor electrical cabinets for control panels, power distribution, meters and industrial equipment. Source from Foshan suppliers.

Specifications

Material
Carbon Steel / Stainless Steel
Protection Rating
IP54 / IP65 / IP66 Optional
Mounting Type
Wall Mount / Floor Standing
Surface Finish
Powder Coated
Application
Industrial Use
Customization
Available

Quick Answer

Placing control or power equipment outdoors means rain, dust, UV and hose-down will destroy a standard indoor box. UniRegal builds IP65/IP66 outdoor cabinets with sealed gaskets, corrosion-resistant coating and thermal management (filter fan or air conditioner) to your layout. Cabinet lead time is ~15 days; UL 508A construction is available on request.

IP65 and IP66 Outdoor Electrical Cabinets for Industrial Equipment

UniRegal supplies outdoor electrical cabinets for control panels, power distribution, meters, telecom equipment, pump stations, utilities, and industrial automation equipment.
Outdoor cabinets must manRecent Projects (Anonymous)
Real deliveries through our Foshan sourcing network. Client names withheld by request.

Project Example — Outdoor IP66 Meter & Distribution Cabinet, 2026


  • Scope: 3× outdoor cabinets for a solar farm — metering, string combiner and distribution in one weatherproof body.
  • Panel: IP66 316 stainless, polyurethane-gasketed door, UV-stable coating, cable glands.
  • Country: Australia.

Engineering Review Example

Customer Requirement: Cabinets exposed to full sun and rain for 10+ years; the previous batch leaked at the door within two seasons.
Our Suggestion: Move from IP65 to IP66, use a poured polyurethane gasket (not foam tape), and add a drip skirt above the door seam.
Final Design: IP66 316 body, PUR-gasketed door, drain holes + breather, FAT included a hose-down check at the seam before shipment.

Why Choose UniRegal for Outdoor Cabinets

  • IP65 vs IP66 specified by duty — we don't oversell a rating you don't need, or underspec one you do.
  • Foshan multi-supplier sourcing — enclosure + internal gear sourced together.
  • MOQ 5 units, 15-20 day fabrication; components ship in 3–5 days.
  • Material honesty — 304 / 316 / galvanized by exposure, not by default.
  • FAT before shipment — seal check, photos on request.

Lead Time & FAT

Item
Lead time
Enclosure / cabinet
~15 days
Internal components
3–5 days
FAT + inspection
Before shipment, photos available

FAQ — Outdoor Cabinets

Q: IP65 or IP66 for outdoors? A: Sheltered / occasional spray → IP65. Direct rain, hose-down, full sun → IP66 with a PUR gasket. We spec by exposure.
Q: 304 or 316 stainless outside? A: Coastal or chemical → 316. Inland dry → 304 is enough. Galvanized is an option for non-food duty.
Q: How do you prove the seal holds? A: FAT includes a seam check; for outdoor builds we can run a hose-down verification on request.

Applicable Industries

Solar & renewables, telecom, water, traffic, outdoor metering, remote sites.

Request Engineering Review

Have an enclosure drawing or duty spec? Upload it → we return an engineering review + quotation in 1–2 working days.
Request Engineering Review →age rain, dust, sunlight, heat, condensation, cable entry, corrosion, and maintenance access. The correct design depends on the site, not only the IP label.

Information to Send Before Quotation

- cabinet dimensions, drawing, or target equipment layout;
- required IP65, IP66, or NEMA rating and outdoor exposure condition;
- material and surface finish;
- cooling method, condensation control, and cable entry direction;
- canopy, plinth, base, wall, or pole mounting requirements;

What UniRegal Can Deliver

UniRegal can deliver outdoor cabinet fabrication, powder coating or stainless steel construction, backplate preparation, cutouts, gland plates, canopies, plinths, labels, packing, and agreed inspection records.

FAQ

What information is needed for the quotation?

Send drawings or sketches, dimensions, material, IP rating, mounting style, cable-entry direction, accessory requirements, quantity, and installation environment.

Can UniRegal build from customer drawings?

Yes. Build-to-print enclosure orders are practical when drawings, material, finish, tolerances, and inspection points are agreed upon before production.

Can custom cutouts and labels be included?

Yes. HMI, push button, meter, lock, hinge, gland, ventilation, and label requirements can be produced according to approved drawings.

Can UniRegal support repeat OEM orders?

Yes. Repeat batches can be produced from approved drawings so dimensions, mounting holes, and accessories remain consistent.

How should material be related to solutions & guides?

Specifying outdoor enclosures? We source IP65/IP66 cabinets in carbon steel or 304/316 stainless from Foshan suppliers, with cooling built in. Talk to our team about your project.e selected?

Carbon steel is common for indoor industrial use. Stainless steel is preferred for corrosion, washdown, coastal, food, chemical, or outdoor environments.

Request a Quote

Send drawings, dimensions, material, and IP rating requirements for an enclosure quotation.

Related Guides & Solution Centers

Specifying an outdoor cabinet? Request an engineering review.From our Foshan supplier network — these photos show typical enclosure fabrication and panel-assembly steps carried out by our inspected production partners.





What an outdoor IP65/IP66 build changes in a tropical climate

A sealed enclosure solves water ingress, not the tropical installation. Above 80% relative humidity the failure mode is condensation forming inside the box, and on coastal or port sites chloride attacks the gland plate and unpainted fixings long before the painted body shows any sign of it. For Malaysia the usual adjustments are a UV-stable powder coat or 304/316 stainless, breathers or drainage sized to the daily temperature swing, and anti-condensation heating where the duty cycle justifies the cost — with thermal design starting from a 40 °C ambient rather than a European 25 °C. Our Malaysia market page sets out how we quote outdoor cabinets for that environment.