Industrial automation panels.
Panel detail-1
Panel detail(2)
Panel detail(3)
Panel detail(4)
Panel detail (5)
Machinery Control Panels

Industrial Automation Panel Supplier

Custom industrial automation panels for machinery, utilities, water treatment and process control. Configure PLC, HMI, VFD, I/O and enclosure rating.

Specifications

Enclosure
Wall-mounted, floor-standing, relay rack, outdoor cabinet
Protection Level
IP54, IP55, IP65, IP66, IP68
Voltage
100V-600V
Current
50A, 100A or customized
Socket Quantity
6, 8, 12, 16, 20, 24
Wiring Standard
UL 508A-based, IEC-based, project-specific wiring
Components
Schneider, Siemens, ABB, Omron, Mitsubishi, Allen-Bradley or equivalent
Documentation
Wiring diagram, layout drawing, BOM, test report, labeling list

Quick Answer

This panel integrates PLC, HMI, VFD and I/O to automate machinery, utility and water-treatment processes from a single enclosure. UniRegal builds to your P&ID or sequence-of-operation, sourcing multi-brand components with UL 508A construction available. Lead time ~15 days; we support build-to-print or design-and-build.

Custom Industrial Automation Panels for Machinery, Utilities, and Water Treatment Control

Uniregal supplies custom industrial automation panels for industrial machinery, indoor and outdoor control systems, water and wastewater projects, and electric utility relay rack applications.
Each panel can be configured according to your voltage, current, socket quantity, enclosure protection level, component preference, wiring standard, and project documentation requirements. For projects that need North American control panel requirements, UL 508A-based design and documentation can be discussed before production.

Key Specifications

Item
Available Options
Product Name
Industrial Automation Panel
Type
UL 508A Industrial Control Panel
Rated Voltage
100V-600V
Rated Current
50A, 100A
Number of Sockets
6, 8, 12, 16, 20, 24
Application
Industrial, Indoor, Outdoor, Water & Wastewater, Relay Racks for Electric Utility
IP Level
IP54, IP55, IP65, IP66, IP68
Lock Type
Customized
Place of Origin
Shanghai, China
Quality Focus
Reliable, Safe, and Project-Ready

Built for Real Industrial Applications

An industrial automation panel should be selected according to the actual working site, not only according to a product name.
A panel used inside a clean factory workshop has different requirements from a panel installed near a wastewater treatment system, an outdoor utility site, or a retrofit project where old wiring and discontinued components still need to be considered.
Uniregal helps buyers confirm the practical details before production, including incoming voltage, rated current, socket quantity, enclosure protection, wiring space, component brand, terminal layout, labeling method, and documentation requirements.

Application Areas

Application
Typical Use
Industrial Machinery
Machine control, relay logic, power distribution, motor control, signal wiring
Water & Wastewater Systems
Pump control, dosing control, valve control, level signals, alarm circuits
Electric Utility Relay Racks
Relay sockets, protection circuits, monitoring terminals, control wiring
Outdoor Industrial Sites
IP-rated control cabinets for dust, rain, and field installation conditions
Factory Production Lines
Equipment control, automation upgrades, maintenance replacement, production support
Retrofit Projects
Replacement of old panels, wiring cleanup, component upgrade, layout improvement

Configuration Options

Configuration Item
Options
Enclosure Type
Wall-mounted cabinet, floor-standing cabinet, relay rack, outdoor enclosure
Protection Level
IP54, IP55, IP65, IP66, IP68
Rated Voltage
100V-600V
Rated Current
50A, 100A, or customized according to load requirement
Socket Quantity
6, 8, 12, 16, 20, 24
Wiring Standard
UL 508A-based, IEC-based, or project-specific wiring requirement
Components
Schneider, Siemens, ABB, Omron, Mitsubishi, Allen-Bradley, or equivalent brands
Labeling
Wire labels, terminal labels, device labels, nameplate information
Documentation
Layout drawing, electrical schematic, wiring diagram, BOM, test report

Why Panel Specification Matters

Many panel problems do not come from one failed component. They come from unclear specification before production.
A cabinet may look acceptable in a quotation but become difficult to install when cable entry is not considered. A panel may pass a simple power-on check but create maintenance problems later if the terminal layout, labels, spare space, and drawings are not clear. For outdoor or wastewater applications, the wrong enclosure protection level can also create long-term reliability problems.
That is why we review the panel as a project item, not only as an electrical box.

What Should Be Confirmed Before Ordering?

Before ordering an industrial automation panel, the following details should be checked:
Information Needed
Example
Application
Machine control, pump system, relay rack, wastewater system
Rated Voltage
220V, 380V, 480V, 600V
Rated Current
50A, 100A, or actual load current
Installation Environment
Indoor, outdoor, wet area, dusty area, utility site
IP Rating
IP54, IP65, IP66, IP68
Socket Quantity
6, 8, 12, 16, 20, 24
Component Preference
Siemens, Schneider, ABB, Omron, Mitsubishi, Allen-Bradley
Drawing Availability
Existing schematic, layout drawing, wiring diagram, or panel photos
Compliance Requirement
UL 508A-based design, IEC wiring, project-specific standard
Documentation Requirement
BOM, test report, terminal list, packing list, nameplate information

UL 508A Industrial Control Panel Options

For projects requiring industrial control panels for the North American market, UL 508A is often an important reference for panel construction, component selection, wiring, spacing, marking, and short-circuit current rating review.
Uniregal can support UL 508A-based panel design when required. The exact requirement should be confirmed before quotation, especially if the project needs specific components, SCCR calculation, documentation, inspection, or labeling requirements.

Panel Testing Before Shipment

Each panel can be checked before shipment according to the confirmed drawings and project requirements.
Typical inspection items include the following:
  • Component model verification
  • Wiring continuity check
  • Terminal and label inspection
  • Layout and assembly inspection
  • Grounding check
  • Power-on test when applicable
  • Function test according to agreed control logic
  • Visual inspection before packing
  • Packing inspection before delivery
The purpose of testing is not only to see whether the panel can be powered on. It is to reduce wiring mistakes, unclear labels, missing components, and installation problems before the panel reaches the site.

Available Documents

Project documentation can be prepared according to the confirmed order scope.
Available documents may include:
  • General arrangement drawing
  • Electrical schematic
  • Wiring diagram
  • Bill of materials
  • Terminal list
  • Nameplate information
  • Label list
  • Test report
  • Packing list
  • Compliance-related documents if required

Industrial Automation Panel for Retrofit Projects

Many automation panel requirements come from existing machines or old project sites.
In these cases, the buyer may not have complete drawings. The old panel may contain discontinued components, unclear wiring, damaged terminals, or a layout that is difficult to maintain.
For retrofit and replacement projects, you can send us existing panel photos, component lists, old drawings, nameplate information, and site voltage details. We can review the available information and help propose a practical replacement panel configuration.

Lead Time

Lead time depends on panel quantity, component brand, wiring complexity, enclosure type, documentation requirements, and whether special compliance review is needed.
For urgent replacement or project delay situations, we can first review the critical components and propose a realistic delivery schedule before full production confirmation.

FAQ

What is an industrial automation panel?

An industrial automation panel is an electrical control assembly used to manage industrial equipment, machinery, sensors, relays, drives, motors, and control signals. It usually includes protection devices, terminals, relays, sockets, wiring, and optional PLC, HMI, or VFD components.

What does an industrial automation panel do?

It helps control how industrial equipment starts, stops, protects itself, communicates, and responds to field signals. It also gives maintenance teams a structured place to inspect wiring, replace components, and troubleshoot faults.

What is considered an industrial control panel?

An industrial control panel is usually an enclosure or assembly containing two or more power circuit components, control circuit components, or a combination of both. It is used to control industrial machines, equipment, or processes.

What is the difference between an industrial automation panel and an electrical control panel?

An electrical control panel is a broader term. An industrial automation panel usually focuses more on machine control, automation signals, relays, PLCs, drives, sensors, and process control functions used in industrial environments.

What UL standard applies to industrial control panels?

UL 508A is commonly used for industrial control panels in North American projects. If the panel is part of industrial machinery, NFPA 79 may also be relevant depending on the machine and project requirement.

Can this panel be built according to UL 508A requirements?

Yes, UL 508A-based design can be discussed before production. The final configuration depends on component selection, wiring method, SCCR requirement, enclosure design, markings, and documentation scope.

How do I choose the right IP rating?

Indoor clean environments may use IP54 or IP55. Outdoor, dusty, wet, or wastewater environments usually need higher protection, such as IP65 or IP66. IP68 should only be selected when the installation condition truly requires a higher sealed protection level.

How do I choose the right panel size?

Panel size depends on component quantity, wiring space, heat dissipation, cable entry, installation method, maintenance access, and future spare space. A smaller cabinet may reduce the initial cost, but it can make wiring and maintenance more difficult later.

Can the number of sockets be customized?

Yes. Available socket quantities include 6, 8, 12, 16, 20, and 24. The final layout should also consider wiring access, labeling, maintenance space, and project documentation.

Can we specify component brands?

Yes. Components can be selected according to your project standard, local maintenance preference, budget, and availability. Common options include Schneider, Siemens, ABB, Omron, Mitsubishi, Allen-Bradley, or equivalent alternatives.

Can you build replacement panels from photos or old drawings?

Yes. For retrofit projects, you can send existing panel photos, old wiring drawings, component lists, nameplate information, and site voltage details. We can review the information and suggest a practical replacement configuration.

What information should I send for a quotation?

Please send the application, rated voltage, rated current, socket quantity, indoor or outdoor installation, IP rating, component brand preference, drawings if available, and any UL 508A or documentation requirement.

Request a Quotation

Send us your panel requirement, including voltage, current, socket quantity, IP rating, application, and component preference.
Our team will review the configuration before quotation, so you receive a practical industrial automation panel proposal instead of only a cabinet price.

Email: info@uniregal.com
What'aspp: 86-13535080546
These three applications rarely share a scope, so each is quoted against its own I/O list and environment. Start with what to send for a control panel quote , or see custom control panels .