
Stainless Steel Enclosures
Stainless Steel Electrical Enclosure Supplier
Custom 304 and 316 stainless steel electrical enclosures for control panels, washdown, outdoor, food, water treatment, chemical and industrial automation applications.
Specifications
- Material
- Carbon Steel / Stainless Steel
- Protection Rating
- IP54 / IP65 / IP66 Optional
- Mounting Type
- Wall Mount / Floor Standing
- Surface Finish
- Powder Coated
- Application
- Industrial Use
- Customization
- Available
Quick Answer
Operating in washdown, coastal or chemical environments where carbon steel rusts? UniRegal supplies 304 and 316 stainless steel enclosures with smooth welded seams and IP66 sealing for food, pharma and outdoor use. We size and finish to your drawing and source certified grades and gaskets from multiple brands. Fabrication lead time is ~15 days; UL 508A is available.
304 and 316 Stainless Steel Electrical Enclosures
UniRegal supplies custom stainless steel electrical enclosures for control panels, junction boxes, automation equipment, water treatment, food processing, chemical plants, outdoor installations and corrosive environments.
304 stainless steel is common for many industrial and washdown applications, while 316 stainless steel is often considered for stronger corrosion, coastal or chemical exposure.
Information to Send Before Quotation
- drawing, sketch, sample photo or required dimensions;
- 304 or 316 stainless steel requirement and surface finish;
- IP rating, installation environment and corrosion exposure;
- backplate, gland plate, hinges, locks, window and cutout needs;
What UniRegal Can Deliver
UniRegal can support stainless steel enclosure fabrication, cutting, bending, welding, polishing or brushing, backplate fitting, cutouts, labels, packing and agreed quality checks.
FAQ
What information is needed for quotation?
Send drawings or sketches, dimensions, material, IP rating, mounting style, cable-entry direction, accessory requirements, quantity and installation environment.
Can UniRegal build from customer drawings?
Yes. Build-to-print enclosure orders are practical when drawings, material, finish, tolerances and inspection points are agreed before production.
Can custom cutouts and labels be included?
Yes. HMI, push button, meter, lock, hinge, gland, ventilation and label requirements can be produced according to approved drawings.
Can UniRegal support repeat OEM orders?
Yes. Repeat batches can be produced from approved drawings so dimensions, mounting holes and accessories remain consistent.
How should material be selected?
Carbon steel is common for indoor industrial use. Stainless steel is preferred for corrosion, washdown, coastal, food, chemical or outdoor environments.
Request a Quote
Send drawings, dimensions, material and IP rating requirements for an enclosure quotation.
