



Outdoor Cabinets (IP65/IP66)
Control Cabinet Supplier & Sourcing Partner for OEM | UniRegal
IP65/IP66 and NEMA 4X control cabinets from our Foshan multi-supplier network. Carbon steel, 304 or 316 stainless. MOQ 5 units, ~15-day build.
Control Cabinets — What You Actually Specify
A control cabinet is the structural enclosure that houses your control gear — PLCs, drives, terminals, and power distribution. It is the box; a control panel is what you build inside it. UniRegal supplies the cabinet system itself, either bare (empty, for your team to populate) or partially dressed with mounting plate, cable gland plate, and cooling pre-fitted — sourced through our Foshan multi-supplier network and shipped as one accountable package.
If you search "control cabinet," you are usually solving one of three problems: corrosion in a harsh duty, heat build-up that trips your drives, or a footprint that does not fit the site. The spec below is how we keep those three under control.
Material — Carbon Steel, 304, or 316
- Carbon steel (powder-coated / galvanized): indoor, dry duty. Lowest cost, the default for factory floor and MCC rooms.
- 304 stainless: washdown, food, and mildly corrosive duty. The right call for most outdoor-but-not-chemical environments.
- 316 stainless: chemical, coastal, and wastewater exposure. We specify 316 only where chloride or acid is present — not by habit.
Protection — IP54 / IP65 / IP66 and NEMA 4X
For outdoor and washdown duty we build to IP65 / IP66 with a polyurethane-sealed gasket, and to NEMA 4X where corrosion resistance and hose-down are required. IP54 is for indoor dust-tight use only — we will flag it if your duty is wet.
Cooling — The Part Most Cabinets Get Wrong
VFDs and power supplies shed heat. A sealed IP66 box with no cooling will cook your drives. Options we dress the cabinet with:
- Filter fan + louvre: for IP54 indoor, low heat load.
- Air conditioner (closed-loop): for IP65/IP66 outdoor where the inside must stay dry and cool.
- Heat exchanger: when you need IP66 but zero outside-air intake.
Cable Entry, Mounting, and Grounding
- Cable gland plate: pre-punched or modular gland plates so field wiring reuses your existing conduit runs.
- Mounting: floor-standing on plinth, wall-mounted, or pole-mounted — form factor matched to the site, not a catalogue default.
- Grounding/bonding: earthing studs and a continuous bond path so the cabinet meets your site's electrical spec.
Spec | Typical option | When |
|---|---|---|
Material | Carbon steel / 304 / 316 | Dry / washdown / chemical-coastal |
Protection | IP54 / IP65 / IP66 / NEMA 4X | Indoor / outdoor / hose-down |
Cooling | Filter fan / A/C / heat exchanger | By internal heat load |
Supply state | Bare or partially dressed | Your build vs our build |
MOQ | 5 units | One shipment, one accountability |
Recent Projects (Anonymous)
Real cabinet deliveries through our Foshan sourcing network. Client names withheld by request.
Project Example — Outdoor IP66 Drive Cabinets, 2026
[PHOTO: floor-standing 316 stainless cabinets with closed-loop A/C, Foshan partner facility]
- Scope: 6× outdoor IP66 cabinets to house VFDs for a pumping station retrofit.
- Cabinet: 316 stainless, IP66, closed-loop air conditioner, pre-fitted cable gland plate, floor-standing on plinth.
- Country: Middle East.
Engineering Review Example
Customer Requirement: Existing carbon-steel cabinets had rusted through in a coastal duty; the client needed a drop-in replacement that kept the same footprint and cable entry so the site did not re-route conduit.
Our Suggestion: Move to 316 stainless, keep the original footprint, and reuse the old gland-plate pattern so field wiring was unchanged. Add closed-loop cooling because the VFD heat load had tripped the previous sealed boxes.
Final Design: Six 316 IP66 cabinets, gland plate matched to the original drawing, A/C sized to the drive heat load, FAT with a thermal check, shipped with a cross-reference sheet for the site electrician.
Why Choose UniRegal for Control Cabinets
- Foshan multi-supplier sourcing — enclosure + cooling + glands sourced together, one shipment, one accountability.
- MOQ 5 units, ~15-day build; components ship in 3–5 days when you also need PLC / VFD / terminals.
- Material spec kept honest — we specify 304 vs 316 (and whether you even need stainless) by duty, not by upsell.
- Cooling sized to your load — we ask for the drive heat load before quoting, so the box does not cook your equipment.
- FAT before shipment — seal check, cooling function test, gland-plate fit, inspection photos on request.
Lead Time & FAT
Item | Lead time |
|---|---|
Enclosure / control cabinet | ~15 days |
Cooling / glands / components | 3–5 days |
FAT + inspection | Before shipment, photos available |
Inside the Foshan sourcing network behind these cabinets
Uni Regal is based in Foshan and we are on site. That is how we hold quality and lead time on a cabinet order — we are in the workshops of our sourcing network while the work is running, checking formed panels, welded frames and assembled doors against your approved drawing, rather than waiting for a finished cabinet to arrive.
We are a Foshan sourcing partner. We do not run our own line: enclosures are formed, welded, finished and assembled across a network of Foshan shops we have worked with for years, and we hold the schedule, the specification and the inspection record on your behalf. You order from one contact, and one contact answers for the result.
From the workshops in our Foshan sourcing network

Inside one of the shops in our Foshan sourcing network — multiple work stations, not a single bench.

Sheet metal forming at a partner site — this is where the enclosure starts.

Welded frame section, carbon steel, before finishing.

Enclosure batch in build. We hold the schedule, not just the order.

Batch run, checked against the approved drawing at each stage.

Warning identification and floor marking on a hazard-rated enclosure.
Reference checks are welcome. We have supplied cabinets into projects for testing-equipment makers, water and wastewater integrators, and packaging machine OEMs — including builds where the customer supplied the core PLC or RTU and we supplied everything around it. For buyers who need to verify us before they commit, references are available on request.
FAQ — Control Cabinets
Q: Do you supply empty cabinets or dressed ones?
A: Both. Bare enclosures for your own build, or partially dressed with mounting plate, gland plate, and cooling pre-fitted. Tell us which.
Q: 304 or 316 stainless for a coastal site?
A: Coastal or chemical-exposed → 316. Inland washdown → 304 is usually enough. We specify by duty, not by default.
Q: How do you stop the cabinet from overheating?
A: We size cooling to your internal heat load — filter fan for low-load indoor, closed-loop A/C or heat exchanger for sealed IP66 outdoor duty.
Q: Can you match an existing footprint and cable entry?
A: Yes. Send the current drawing or a photo of the gland plate; we replicate the footprint and entry pattern so field wiring is unchanged.
Applicable Industries
Water & wastewater, HVAC, manufacturing, oil & gas (harsh-site), food & beverage, infrastructure & utilities.
Request Engineering Review
Have a drawing or duty spec? Send it → we return an engineering review + quotation in 1–2 working days.
If the cabinets are bound for Malaysia
One line in the specification decides the entire approval path, and it is worth settling before the BOM is frozen: an assembly installed in Malaysia has to clear SIRIM QAS certification plus Energy Commission (Suruhanjaya Tenaga) registration, which means the drawings have to carry MS IEC 61439 design and type-test data rather than a build standard alone. Our control panel supplier guide for Malaysia maps each requirement to what we can actually supply against it — assembly documentation, SIRIM-certified component options, and the 415 V / 50 Hz build — and states plainly what we will not claim in advance.
Get a Quote for Your Project
Send your drawings, BOM or I/O list — or, if the panel already exists, photos of what you have. We quote from whatever stage your documents are at, and every quotation comes back with the scope, assumptions and lead times written out, not just a number.
Lead times by supply scope: complete custom panels from 1 unit, typically 35–40 days after drawing approval; empty enclosures from 5 units, around 15 days; components ship in 3–5 days.
Fastest route: send your documents by WhatsApp — message us on WhatsApp — or email info@uniregal.com with the subject "RFQ", or use the contact form. You will get a reply within one business day.
