HVAC Control Panels | Custom Built for Buildings | UniRegal

Control Panels Built for HVAC Systems and Building Automation

Custom HVAC control panels with BMS integration, UL 508A configurations via UL-listed partners, and fast lead times. Built for commercial & industrial buildings. Get a quote.

HVAC Panel System

COMMON HVAC CHALLENGES

Why Many HVAC Systems Work on Paper but Fail During Commissioning

Most HVAC projects do not get delayed because of major equipment failures. More often, the problems appear during commissioning, when communication networks, field devices, and control systems are expected to work together for the first time.

BACnet communication faults, incorrect I/O mapping, undocumented field changes, and integration issues between control panels, VFDs, sensors, and BMS platforms are among the most common causes of HVAC startup delays and on-site rework.

HVAC CONTROL SOLUTIONS

Control Solutions for Critical HVAC Systems

Different HVAC systems require different control strategies. We support common applications ranging from air handling units and chilled water plants to pump stations and building automation systems.

01

AHU Control Panels

Monitor and control air handling units, dampers, filters, fans, temperature sensors, and ventilation equipment for stable indoor air management.

02

Chiller Plant Control Systems

Coordinate chillers, cooling towers, pumps, and energy management strategies to improve system efficiency and operational reliability.

03

Pump Control Panels

Support booster pumps, circulation pumps, and pressure control systems with automatic sequencing, protection, and monitoring functions.

04

Building Automation Integration

Enable communication between HVAC equipment and BMS platforms through BACnet, Modbus, KNX, and other industrial protocols.

05

Ventilation & Exhaust Systems

Control fresh air, exhaust air, smoke extraction, and ventilation equipment to maintain air quality and regulatory compliance.

06

Data Center Cooling Systems

Support precision cooling, CRAC units, chilled water distribution, and environmental monitoring for mission-critical facilities.

TECHNICAL CAPABILITIES

HVAC Control Panel Technical Capability Snapshot

Every HVAC project has different operational, communication, and installation requirements. Our control solutions are designed to support the protocols, components, and environments commonly found in commercial and industrial HVAC systems.

BMS
INTEGRATION
Can the panel communicate with the existing building management system?
FAT
TESTING
Has the control sequence been verified before shipment?
VFD
MOTOR CONTROL
Can the panel support fan and pump speed control requirements?
IP65
PROTECTION
Will the enclosure withstand the installation environment?

COMMON HVAC APPLICATIONS

Where HVAC Control Panels Are Most Commonly Used

HVAC control panels are used across commercial buildings, industrial facilities, infrastructure projects, healthcare environments, and mission-critical cooling systems.

HVAC Control Panel FAQ

What Buyers Want to Know Before Selecting an HVAC Control Panel

Selecting the right HVAC control panel often involves questions about communication protocols, system integration, testing, customization, and long-term operation.

Need project-specific advice? Share your HVAC application requirements and our engineering team will help identify a suitable control solution.

SYSTEM SOLUTIONS

Solutions That Keep HVAC Systems Running Reliably

Explore electrical control panels, industrial UPS systems, outdoor electrical enclosures, and automation solutions designed for air handling units, chilled water systems, pump control, ventilation, and building automation.