Power Distribution & Control Panels
Custom power distribution and control panels for industrial automation, machinery, utilities, and commercial projects.
Built for safe power management, reliable system control, and flexible integration with your project requirements.
Product Overview
Our power distribution and control panels are designed to manage electrical power safely and efficiently in industrial environments.
We support customized panel design, component selection, assembly, testing, and global delivery for panel builders, OEMs, and system integrators.
Typical Applications
- Industrial power distribution systems
- Factory automation projects
- Machinery control systems
- Water treatment facilities
- HVAC and building systems
- Utility and infrastructure projects
Key Benefits for Buyers
- Custom design based on your electrical drawings
- Multi-brand component options available
- Stable supply for project-based orders
- Support for global voltage standards
- Pre-delivery wiring inspection and testing
- Fast response for quotation and technical review
Configuration Options
- Voltage: 110V / 220V / 240V / 380V / 480V / Custom
- Rated Current: Customized by project load
- Protection Level: IP41 / IP54 / IP65 / IP66
- Cabinet Material: Carbon Steel / Stainless Steel
- Installation: Wall-mounted / Floor-standing
- Application: Indoor / Outdoor
Component Options
We can build panels with components from major automation and electrical brands, depending on your project standards.
Supported brands include Siemens, Schneider, ABB, Mitsubishi, Omron, Allen-Bradley, and other industrial brands.
Built for Global Projects
Our panels can be configured for projects in North America, Europe, the Middle East, Asia, and other industrial markets.
We support different voltage systems, installation environments, and project documentation requirements.
Quality Control
Each panel is checked before delivery to reduce installation risk and project delays.
Inspection can include:
- Labeling and packing review
RFQ – Request for Quotation
To receive a fast and accurate quotation, please provide:
- Electrical drawings or panel layout
- Voltage and current requirements
- Preferred component brands
- Indoor or outdoor installation
- Quantity and delivery timeline
- Destination country or project location
Even if your specifications are not complete, our team can help review your requirements.
Contact
Send your requirements to info@uniregal.com or contact us via WhatsApp for quick support.