111
ProductsIndustrial UPS Systems
image-post3-630x630-g5dcc4
image-post3-630x630-g5dcc4
image-post2-630x630-aqydju
Industrial UPSIn Stock Components

Industrial UPS Systems

Your Factory’s Heartbeat: Rugged Power Protection for Zero-Downtime Operations

Industrial UPS Systems | 100% Uptime for Mission-Critical Automation

Your Factory’s Heartbeat: Rugged Power Protection for Zero-Downtime Operations

In a modern smart factory, a 10-millisecond power flicker isn't just a nuisance—it’s a catastrophic failure. It means crashed PLC programs, ruined batches of product, and hours of expensive recalibration.
At Uniregal, our industrial UPS (Uninterruptible Power Supply) systems are built for the "dirty power" of the industrial world. While a control cabinet organizes your logic, our UPS ensures that logic never sleeps. This isn't an office-grade backup; this is a ruggedized power fortress designed to survive voltage sags, frequency fluctuations, and the harsh electromagnetic interference (EMI) common in heavy manufacturing.

Why Industrial UPS is NOT a "Computer UPS":

  • Extreme Temperature Resilience: While commercial UPS units fail above 25°C, our industrial series operates reliably from -10°C to +55°C inside hot enclosures.
  • Online Double Conversion: We utilize true online technology. Your equipment never "switches" to battery; it is always fed clean, synthesized power, isolating it 100% from grid spikes and noise.
  • Vibration & Dust Proofing: Reinforced PCB coatings (conformal coating) and ruggedized chassis protect internal electronics from factory vibrations and conductive dust.
  • Extended Lifespan: Built with high-grade industrial capacitors and long-cycle batteries, reducing your Total Cost of Ownership (TCO) over a 10-15 year life cycle.



Featured Industrial UPS Solutions

Product Category
Best For...
Key Advantage
DIN-Rail UPS (DC/AC)
PLC & HMI Backup
It's compact and fits inside standard control cabinets.
Rugged Rackmount UPS
Server Rooms & Edge Computing
1U/2U High-density power for industrial IT.
Modular Industrial UPS
Large-Scale Manufacturing
Hot-swappable power modules for N+1 redundancy.
Outdoor Rated UPS
Oil & Gas / Telecom
IP65 protected for extreme remote environments.



Solving Your Power Challenges:

1. Why can’t I just use a high-end office UPS for my PLC cabinet?

The Reliability Gap: Office UPS units are designed for air-conditioned rooms. In a factory, the heat inside a cabinet will "bake" an office UPS battery, causing it to fail in months. Our Industrial UPS uses high-temp components and advanced thermal management to ensure that when the grid goes down in mid-summer, your machines keep running.

2. Lithium-Ion vs. Lead-Acid (VRLA) batteries: Which is better for industrial use?

It depends on your footprint and maintenance schedule.
  • Lead-Acid (VRLA): Proven, lower upfront cost, but heavier and requires replacement every 3-5 years.
  • Lithium-Ion (LiFePO₄): 10-year lifespan, 50% lighter, and handles high heat much better. Most Uniregal customers are switching to lithium to eliminate the headache of frequent battery maintenance.

3. How do I handle "dirty power" from large motors and welders?

Large industrial loads create harmonics and voltage sags that fry sensitive electronics. Our online double conversion UPS acts as a "power purifier." It converts incoming AC to DC, then back to a perfect sine wave AC. Your sensitive PLCs and sensors never see the "noise" from the rest of the factory.

4. Can I monitor the UPS health remotely without going to the factory floor?

Absolutely. Every Uniregal Industrial UPS is equipped with SNMP/Modbus communication ports. You can monitor battery health, load levels, and temperature from your central SCADA system or even a mobile app, allowing for predictive maintenance before a failure happens.

5. How do I size the UPS for my specific automated line?

Don't just look at the "Total Watts." You must account for Inrush Current (the surge when motors start). We recommend sizing the UPS at 1.2x to 1.5x your steady-state load. If you aren't sure, send us your load list, and our engineers will calculate the exact KVA and runtime you need.



Global Compliance & Regional Optimization

We engineer our UPS systems to meet international power standards, ensuring seamless integration wherever your project is located:
  • North America: 120V/208V 60Hz, UL 1778 certified for industrial safety.
  • Europe & Asia: 230V/400V 50Hz, CE/IEC 62040 compliant.
  • Extreme Regions: Specialized units for the high-sulfur air in paper mills or the high-altitude mines of South America.




Stop Risking Your Production Line

A single power event can cost more than a high-quality UPS. Protect your investment with Uniregal’s industrial-grade power solutions.