111
ProductsHVAC Control Panels
image-post2-630x630-aqydju
image-post2-630x630-aqydju
image-post3-630x630-f072q9
image-post1-630x630-mfchz3
Custom Control PanelsCustomizable

HVAC Control Panels

Smart control systems for building automation and climate control

Service Details

Training Duration2 days
Group Size20-50 people
Training ModeIn-person intensive training

HVAC Control Panels

Custom HVAC control panels designed for building automation systems, air handling units, and industrial climate control applications.
Built for reliable operation, energy efficiency, and seamless integration into your HVAC systems.



Overview

Our HVAC control panels are engineered for commercial and industrial HVAC systems, including AHU units, chillers, cooling towers, and ventilation systems.
We provide customized solutions based on your system requirements, ensuring stable performance, easy integration, and long-term reliability.



Typical Applications

  • Air Handling Units (AHU)
  • HVAC Systems for Commercial Buildings
  • Chiller & Cooling Systems
  • Ventilation & Exhaust Systems
  • Industrial Temperature Control Systems



Key Features

  • Energy-efficient control with VFD integration
  • Stable motor control for fans and pumps
  • Flexible configuration based on project needs
  • Compatible with building automation systems (BMS)
  • Designed for continuous industrial operation



Technical Configurations

  • Voltage: 220V / 380V / 400V / 480V / Custom
  • Control System: PLC / VFD / HMI Integrated
  • Protection Level: IP20 / IP54 / IP65
  • Power Range: Customized based on system load
  • Installation: Indoor / Outdoor



Supported Brands

Siemens, Mitsubishi, Schneider, ABB, Omron, Allen-Bradley, and other industrial automation brands are available based on your project requirements.



Project Support

We support HVAC projects from initial requirements to final delivery, including component selection, panel design, assembly, testing, and global shipping.



Quality Assurance

All panels undergo full wiring inspection, functional testing, and performance verification before delivery to ensure reliable operation.



RFQ – Request for Quotation

To receive a fast and accurate quotation, please provide:
  • HVAC system type (AHU, chiller, ventilation, etc.)
  • Required brands (if any)
  • Voltage and power requirements
  • Project location and environment
  • Quantity and delivery timeline
  • Technical drawings or specifications (if available)
Even if you only have basic information, feel free to contact us for support.



Contact

Send your requirements to info@uniregal.com or contact us directly for a quick response.