
Professional 16V Brushless Drill Kit
Key Selling Points:
Brushless Motor Technology - 30% more efficient & 2X longer lifespan than brushed motors
Dual-Speed Control (0-420 RPM / 1350 RPM) - Perfect for delicate tasks AND heavy-duty applications
35N.m Max Torque - Drills through hardwood, metal & masonry with ease
Smart LED Battery Indicator - Never run out of power mid-job
All-in-One Professional Kit - Includes 18 essential hand tools (valued at $XX separately)
Technical Specifications
| Feature | Specification |
| Motor Type | Brushless (Cooler Operation + Less Maintenance) |
| Voltage | 16V Lithium-Ion (20% More Runtime vs Standard 12V) |
| No-Load Speed | 0-420 RPM (Low) / 1350 RPM (High) |
| Max Torque | 35N.m (Ideal for lag bolts & dense materials) |
| Battery | 18-Piece Pro-Grade Accessory Set |
| Included Tools | 18-Piece Pro-Grade Accessory Set |
| Warranty | 3-Year Commercial Warranty |
Why Choose Our Heavy-Duty Construction Drill?
For General Contractors & Crew Leaders
Jobsite Tough – IP54-rated casing withstands concrete dust, driving rain, and 6 ft. drops (exceeds MIL-STD-810G standards)
Ergonomic Dominance – 30% less vibration + heated-grip option for cold-weather work (OSHA-compliant for 12-hour shifts)
Hyper-Efficient – Quick-change SDS chuck swaps bits in 3 sec, even with gloves (saves 11 min/hour vs. competitors)
For Procurement & Fleet Managers
Scale Savings – 22% off orders of 25+ units (with free asset tagging)
White-Glove Branding – Laser-engraved company logos/QR codes (traceability + lost-tool recovery)
Flex Warranties – Choose 1-3 year coverage (incl. loaners during repairs)
For Civil Engineers & GCs
BIM-Ready – Tool syncs with Procore/Autodesk for usage tracking & maintenance alerts
Global Voltage – 110V/220V switchable + EU/UK plug adapters (no downtime overseas)
Cross-Industry Perks (Retailers/DIY Included)
Free Training Hub – Access exclusive video libraries:
Contractors: OSHA-compliant rotary hammer courses ($299 value)
DIYers: 10+ weekend project tutorials (e.g., deck building, tile drilling)
Expandable Ecosystem – Fits 50+ attachments (from rebar cutters to diamond cores)
Package Includes:
1× Heavy-Duty Drill (IP54-rated)
2× 5.0Ah Lithium Batteries (220V/110V auto-switch)
1× SDS-Plus Quick-Change Chuck
1× EU/UK Voltage Adapter Set
Printed Materials:
OSHA-QuickStart Safety Guide (6 languages)
BIM Compatibility QR Code (Links to Procore/Trimble Setup)
Dimensions: 18" x 12" x 8" (45.7×30.5×20.3cm) | Weight: 14.3 lbs (6.5kg)
Shipping Note: Pallet-friendly (40 units/pallet w/custom branding options)
