
100L Portable Water Storage Tank
100L Portable Water Storage Tank Features & Benefits
Stable and Durable
Crafted from premium PVC material with BHP, this tank ensures long-term stability and resistance to wear.
Large Capacity Design
With a 100-liter capacity, it meets diverse household and gardening needs effectively.
Foldable with Protective Cover
The foldable design allows for convenient storage, complemented by a protective cover for added durability.
Easy to Use
Quick setup requires no complex tools, making it accessible for users of all levels.
Efficient Leak Prevention
Equipped with a drain valve and overflow valve, this design enhances safety by preventing leaks efficiently.
Environmentally Friendly
Supports eco-friendly practices with a sustainable rainwater collection system, promoting water conservation.
Selling Points
Efficient and Economical: Offers great value for money while meeting functional demands.
Transportability: Lightweight design makes it easy to move and install.
Versatile Usage: Ideal for gardens, outdoor spaces, and households, enhancing water management.
Comparasion Table:
| Feature | Our Product | Competitor Product | Advantage |
| Capacity | 100L | Similar capacity, some lower | Meets diverse household needs |
| Material | PVC with BHP | Standard PVC, some use heavier materials | Lightweight and easy to install |
| Design | Foldable with protective cover | Standard design, some non-foldable | Foldable for space saving |
| Ease of Use | Easy installation and maintenance | Some products are complex, need extra tools | User-friendly, reduces complexity |
| Additional Features | Overflow valve and drain outlet | Some only have a single outlet | Safer leak prevention design |
| Price | Competitively priced | Higher pricing for premium models | Cost-effective, high value for money |
Bulk Ordering Information
Minimum Order Quantity (MOQ): 100 units
Container Capacity: 3,168 sets/20GP, 6,346 sets/40GP
Lead Time: 75 days from order confirmation
Payment Terms: 100% T/T 30 against B/L
FOB Port: Ningbo
Ideal for
Gardening Enthusiasts: Perfect for watering plants with collected rainwater.
Commercial Landscapers: Reliable bulk orders available for extensive garden projects.
Eco-friendly Homes: Supports sustainable water practices.
Packaging Information:
Container/QTY:
Container Capacity: 3,168 sets/20GP, 6,346 sets/40GP
Lead Time: 75 days from order confirmation
Specifications
Size: Diameter 40cm x Height 70cm
Components: 6 support rods, 1 drain valve, 1 faucet, 1 overflow valve
Material: Durable PVC
Packaging: Color Box, 4 units per case
