Uni Regal Corp. Ltd

English

Precision PRO-961 Laser Level

The Precision PRO-961 Laser Level is an advanced tool designed to elevate your indoor and outdoor leveling tasks. With a robust green laser diode from OSRAM, this level guarantees precision and reliability, making it ideal for professional environments.
Description Package Information Inquiry

Key Features

  • High Accuracy: Achieves leveling accuracy of ±3mm/10m, ensuring precise measurements every time.

  • Advanced Laser Module: Equipped with a powerful 50mW laser, the PRO-961 operates at wavelengths of 635nm and 520nm.

  • 360-Degree Coverage: Three 360° laser lines provide comprehensive visibility around the workspace.

  • Durable Construction: Encased in a hardy plastic case, the tool is rated IP54 for protection against dust and water.

Performance

  • Working Distance: An impressive 30m with the green line laser.

  • Compensation Range: Leveling compensation range of 3° ±1°, automatically adjusts for minor angle variations.

  • Operating Conditions: Functions efficiently between -10°C to 50°C, suitable for various environments.


Additional Information

  • MOQ: 504 units in a color box

  • Lead Time: 75 days post-order

The Precision PRO-961 stands out in its category with cutting-edge technology, superior endurance, and unrivaled precision. Whether for construction, refurbishing, or any other professional task, this laser level is your ultimate solution.


Packing Information:


  • Ceiling clip for stable installations

  • Magnetic bracket for easy attachment to metal surfaces

  • Durable plastic carrying case for secure transportation

  • Shipping: FOB from SHA, packaged at 6 pieces per cut case, 60 pieces per container