
Precision Tools for Extreme Conditions – Built for Professionals
Key Features Designed for Industrial Use
1. Extreme Environment Reliability
Works in freezing cold (-20°C) and scorching heat (60°C)
IP66-rated – Resistant to heavy rain, dust, and accidental drops
Tested in real-world conditions (See video: Sahara Desert & Arctic job site demonstrations)
Ideal for: Oil rigs, bridge construction, and harsh outdoor projects
2. AI-Powered Accuracy (Patented Tech)
Auto-levels in 2 seconds (vs. 10+ seconds with manual levels)
APP integration – Track calibration history & export reports for compliance
Alerts if surface is unstable – Reduces rework
Precision Comparison:
| Manual Level | Manual Level | |
| Calibration Time | Margin of Error | 2 sec |
| Margin of Error | ±0.3° | ±0.3° |
3. Superior Visibility & Range
4x brighter beams than standard red lasers (green laser optional)
50m outdoor range with included target card (vs. 30m for competitors)
Pulse mode for increased visibility in strong sunlight
4. Modular Workflow System
Magnetic 360° bracket – Attaches to steel beams for hands-free adjustments
Heavy-duty tripod – Supports 10kg+ for stability in windy conditions
Outdoor target card – Enhances visibility for long-distance leveling
Who Needs This?
Construction Firms – Perfect for high-rise buildings, road grading, and foundation work
Utility & Telecom – Install power lines and cell towers with precision
Manufacturing Plants – Align heavy machinery and conveyor systems
HVAC & Plumbing – Simplify ductwork and pipeline installations
Bulk order benefits:
Custom branding (laser engraving)
Priority technical support (dedicated engineer assigned)
Discounted accessory bundles
Technical Specifications
| Model | Model |
| Laser Type | Green (530nm) / Red (650nm) |
| Self-Leveling Range | ±5° |
| Accuracy | ±0.1° at 10m |
| Battery | 8+ hrs (2x 18650 rechargeable) |
| Warranty | 3-year industrial warranty |
Why Choose Our Laser Level?
Unmatched Durability – IP66 waterproof & dustproof, operates from -20°C to 60°C (-4°F to 140°F)
Smart AI Auto-Calibration – Achieves ≤0.1° precision with self-adjusting technology (no manual tuning needed)
High-Visibility Lasers – Bright green/red beams visible in direct sunlight (up to 50m range)
Modular Accessory System – Includes magnetic 360° bracket, folding tripod, and outdoor target card
Enterprise-Grade Support – Free onsite training & 30-day no-questions-asked returns for bulk orders
Packing Information – Professional Laser Level Kit
Standard Packaging:
Dimensions: 32 x 24 x 15 cm (12.6 x 9.4 x 5.9 in)
Weight: 3.2 kg (7 lbs)
Included in Each Box:
1x Laser Level Unit (PRO-5000X)
1x Magnetic 360° Bracket
1x Heavy-Duty Folding Tripod
1x Outdoor Target Card
2x Rechargeable 18650 Batteries
1x USB-C Charging Cable
1x User Manual (Multilingual)
1x Quick Start Guide
Bulk Order / B2B Packaging Options
Case Pack Quantity for Wholesale:
Small Case: 5 units per master carton
Dimensions: 50 x 40 x 30 cm (19.7 x 15.7 x 11.8 in)
Gross Weight: 18 kg (39.7 lbs)
Pallet Quantity: 80 units per pallet (16 cases)
Dimensions: 120 x 100 x 150 cm (47 x 39 x 59 in)
Gross Weight: 290 kg (639 lbs)
Shipping & Logistics
Export-Ready Packaging:
IP67-rated waterproof inner liner for Sea shipping /air freight protection
Corrosion-resistant anti-static coating on cartons
Fumigation-free plywood pallets (ISPM-15 certified) for international shipments
Custom Packaging Available:
OEM/Private Label: Add your company logo & branding
Kitting: Include branded safety goggles, tool belts, or calibration certificates
Special Requirements? Contact us for custom solutions
