
PRO-5000X Industrial Self-Leveling Laser Level
High Precision (±0.1°), IP66 Waterproof, -20°C to 60°C | Bulk & OEM Orders Available
Engineered for Professionals Who Demand Ultra-Accurate & Rugged Performance
The PRO-5000X is an industrial-grade laser level designed for engineers, surveyors, and construction professionals who require extreme precision and reliability in harsh environments.
Key Differentiators vs. Standard Lasers:
±0.1° Ultra-High Accuracy – 3X more precise than typical (±0.3°) laser levels
Military-Grade Durability – Works flawlessly from -20°C to 60°C (unlike standard models that fail in extreme temps)
IP66 Water & Dustproof – Built for outdoor construction, factories, and cold storage
High-Visibility Green Laser – 50m range (100m with detector), superior to red lasers
B2B-Focused Features – OEM branding, bulk discounts, and enterprise support
How PRO-5000X Outperforms Standard Models? (vs. Competitor: DEWALT DW088K)
| Feature | DEWALT DW088K (Standard Model) | PRO-5000X (Industrial-Grade) |
| Accuracy | ±0.3° | ±0.1° (3X precision) |
| Temp Range | 0°C to 40°C | -20°C to 60°C |
| Durability | IP54 (splash-proof) | IP66 (fully waterproof & dustproof) |
| Laser Visibility | Red beam (limited outdoor use) | High-power green laser (50m+ range) |
| B2B Options | Retail only | Bulk discounts, OEM branding, 3-year warranty |
Technical Specifications:
Laser Type: Class II Green Laser (520nm)
Accuracy: ±0.1° at 10m
Self-Leveling: Auto-Calibration (<2 sec)
Working Temp: -20°C to 60°C
Protection Rating: IP66 (fully sealed against dust & water)
Battery: Rechargeable 4000mAh (20+ hours runtime)
Accessories Included:
Heavy-duty tripod
Magnetic wall mount
Laser enhancement glasses
Hard carrying case
Bulk Order Advantages:
Bulk discounts: 15% off for 50+ units
OEM/ODM available – Custom branding & packaging
3-year industrial warranty (vs. standard 1-year)
Dedicated account manager for large orders
Packing Information:
Single Unit Packaging:
Product Dimensions: 12.2 x 6.5 x 4.3 inches (31 x 16.5 x 11 cm)
Weight: 3.3 lbs (1.5 kg)
Included: PRO-5000X laser, tripod, magnetic bracket, glasses, case, manual
Bulk Packaging (50 Units):
Master Carton Dimensions: 24 x 18 x 16 inches (61 x 45 x 40 cm)
Weight per Carton: 55 lbs (25 kg)
Units per Pallet: 200 (4 cartons)
OEM Options: Custom logo, packaging, and documentation
