Uni Regal Corp. Ltd

中文版

68-Piece Tool Set: Versatile Solutions

Introducing the 68-Piece Tool Set, your comprehensive solution for all maintenance and repair tasks. With CE-certified tools, this kit ensures practicality, functionality, and superior performance, making it ideal for professional environments. It is ideal for contractors, wholesalers, and B2B procurement managers seeking high-quality and reliable tool solutions.
Description Package Information Inquiry

68-Piece Tool Set Key Features: 


Comprehensive Selection

  • Versatility: Includes sockets, drills, wrenches, screwdrivers, and more for various applications.

  • Certification: CE-certified, ensuring industry standards of safety and quality.

  • Materials: High-grade carbon steel tools for durability and reliability.


Enhanced Design:

  • Waterproof 12V Cordless Drill: Designed for maximum efficiency in varied environments.

  • Adjustable Wrench: Eases operations with carbon steel build for longevity.

  • Magnetic Bit Holder: Facilitates quick and easy bit changes.


User-Friendly Packaging

  • Portable Tool Case: BMC with a color sleeve for organized and secure tool storage.

  • Ideal for Professionals: Engineered to meet the needs of professional contractors and repair specialists.


Detailed Components:

  • Sockets: 1/4" sizes ranging from 5 to 13mm.

  • Drills: For metal and wood, varied sizes for adaptability.

  • Wrench & Screwdrivers: Adjustable and precision-crafted for optimal usability.

  • Additional Tools: Insulating tape, utility knife, and more.


Competitive Differentiation-High-Performance Tools

  • Versatile tool selection catering to diverse tasks, ensuring maximum efficiency.

  • Exceeds competitive standards with CE certification, providing peace of mind to users.

  • Procurement and Branding Options

  • Bulk Purchase Benefits: Designed for contractors and wholesalers with attractive discounts.

  • Custom Branding Available: Tailor the kit with your corporate logo for extensive brand visibility.


Packaging Information

Container/QTY 1x20: As specified

Container/QTY 1x40: As specified

Container/QTY 1x40HQ: As specified

Lead Time: 75 Days

FOB Port: Guangzhou

MOQ: 100 units