
Complete Power Tool Set with Tool Bag
Product Overview
Equip your team with the versatile 20V Power Tool Set, designed to elevate productivity and efficiency on any worksite. Engineered for contractors and procurement managers, our kit offers durability, adaptability, and performance that stand apart in competitive environments.
Key Components
1PC 20V 1/4" Impact Screwdriver:
Max Torque: 180N.m for extreme fastening power.
Speed Range: 0-2400 RPM; Impact Frequencies: 0-4800 BPM for rapid operation.
1PC 20V Cordless Brushless Drill:
Max Torque: 35N.m with torque settings 24+1 for versatility across tasks.
Speed Options: Dual speed control from 0-450/1500 RPM for precision drilling.
2PC 2000mAh Batteries: Ensures consistent power delivery and longer runtime for uninterrupted work.
Desktop Charger: Fast and efficient charging for minimal downtime.
Durable Nylon Bag: Organize and transport your tools hassle-free.
Competitive Differentiation
Built for Tough Conditions
Brushless Motor Technology: Offers superior efficiency and two times the lifespan of conventional brushed motors.
Optimal Torque & Speed: Handles demanding tasks effortlessly, from heavy-duty fastening to intricate drilling.
Procurement Advantage
Bulk Discounts: Available for orders over MOQ 600, offering cost-effective solutions for business scaling.
Custom Branding: Make this kit your own with logo engraving options for corporate identity.
Enhanced User Experience
Ergonomic Design: Reduced vibration for comfort during prolonged use.
Quick Switch: Easy bit changes to maximize workflow efficiency.
General Specifications:
Battery Type: 2000mAh Lithium
Charging Time: 90 minutes
Tool Bag Material: Durable Nylon
Standard Package Includes:
1× Impact Screwdriver
1× Cordless Brushless Drill
2× Lithium-Ion Batteries
1× Desktop Charger
1× Nylon Tool Bag
Packing Specs (Bulk Orders):
Container/QTY 1x20: As specified
Container/QTY 1x40HQ: As specified
Packaging Type: 1 set/Color box
