Uni Regal Corp. Ltd

中文版

Uni Regal 20V 32Nm Cordless Electric Drill

The Uni Regal drill not only meets but exceeds expectations, making it your go-to solution for professional applications. Stand out with a tool designed to deliver unparalleled performance.
Description Package Information Inquiry

Overview

The Uni Regal 20V 32Nm Cordless Electric Drill is crafted for efficiency and power in demanding environments. Ideal for professionals seeking reliability and superior performance, this drill is engineered with precision for diverse applications.


Key Features

Powerful Torque: Delivers a maximum torque of 32Nm, perfect for heavy-duty projects and precision tasks.

Two Variable Speeds: Enjoy flexibility with speeds ranging from 0-400 RPM to 1350 RPM to handle various materials and conditions.

Impact Function: The 21+1 torque settings include impact functionality, enhancing drilling capabilities.

Durable Chuck: Features a versatile drill chuck accommodating sizes 0.8mm to 10mm (1/32” to 3/8”).


Innovative Design

LED Light: Integrated LED lighting ensures visibility in dimly lit spaces, enhancing accuracy.

Self-Locking Chuck: Facilitates quick bit changes, boosting productivity.

Comprehensive Kit: Comes with a robust set of accessories, including multiple drill bits, batteries, and chargers suitable for immediate use.


Package Includes:

Accessories: 28 pieces including machine and various attachments

Batteries: Two 20V 1500mAh batteries for prolonged use

Flexible Extension: Added adaptability for reaching tight spaces


Specifications

MOQ: 10 units

Lead Time: 15 days post-order

Shipping: FOB from Guangzhou