
Air Drain Blaster - Professional Drain Cleaning Tool
Air Drain Blaster Key Features & Benefits:
Powerful Air Pressure Technology
Delivers 5x more force than standard plungers
Instantly clears hair, grease, and debris blockages
No harsh chemicals - safe for all pipes (PVC, metal, septic systems)
Universal Drain Compatibility
Works on kitchen sinks, bathroom drains, showers & tubs
Fits standard 1.25" to 2" drain openings (includes adapters)
Industrial-Grade Durability
Reinforced ABS/PVC construction withstands repeated use
Thicker rubber seal prevents air leaks (20% wider than competitors)
Ergonomic & Easy to Use
One-hand operation - just press and release
No tools required - sets up in seconds
Compact design for easy storage
How It Works (Simple 3-Step Process)
1️. lace over drain (ensure tight seal)
2️. Pump 3-5 times to build pressure
3️. Release to blast away clogs
Tip: For tough blockages, pour hot water first to soften debris
Technical Specifications
Material: High-density ABS body + PVC hose
Color: Professional red/black design
Included: Main unit, 2 drain adapters (1.25" & 2"), user manual
Warranty: 2-year manufacturer guarantee
Why Choose Our Air Drain Blaster?
| Feature | Air Drain Blaster | Chemical Cleaners | Traditional Plungers | Drain Snakes |
| Effectiveness | Clears in 1-3 pumps | May require multiple uses | Often needs repeated plunging | Can miss debris |
| Pipe Safety | Zero damage | Corrodes pipes over time | Safe but can loosen joints | Risks scratches |
| Hygiene | No splashback | Toxic fumes | Splashes dirty water | Hand-contact required |
| Ease of Use | 3-step operation | Waiting time required | Physical effort needed | Disassembly needed |
| Eco-Friendly | 100% chemical-free | Toxic runoff | Safe but wasteful water use | Metal waste |
Key Advantages:
Faster than plungers & chemicals
Safer than snakes & corrosive cleaners
Cleaner than traditional methods

Customer Concerns Addressed (FAQ)
Q: Will this work on completely blocked drains?
A: For severe clogs, we recommend:
Pour boiling water to soften blockage
Use short, rapid pumps (3-5 bursts)
Repeat if needed
Q: Why does air sometimes escape?
A: Solution:
Wet the rubber seal slightly before use
Apply downward pressure while pumping
Our upgraded 2024 model features a thicker gasket
Q: Is this safe for garbage disposals?
A: Yes! Unlike chemicals, it won't damage disposal blades.
Q: What's your return policy?
A: 100% satisfaction guarantee - contact us within 30 days if unsatisfied.
Packaging Information:
Packing: 1 PC/Color Box, 6 PCS/Cut Case/Master
MOQ: 100 PCS
