Uni Regal Corp. Ltd

中文版

100L Portable Water Storage Tank

The 100L Portable Water Storage Tank is expertly designed for efficient rainwater collection and storage in residential or commercial settings. Constructed from durable PVC, this foldable tank is both stable and easy to use, with features that enhance water conservation and management
Description Package Information Inquiry

100L Portable Water Storage Tank Features & Benefits

  • Stable and Durable

    Crafted from premium PVC material with BHP, this tank ensures long-term stability and resistance to wear.

  • Large Capacity Design

    With a 100-liter capacity, it meets diverse household and gardening needs effectively.

  • Foldable with Protective Cover

    The foldable design allows for convenient storage, complemented by a protective cover for added durability.

  • Easy to Use

    Quick setup requires no complex tools, making it accessible for users of all levels.

  • Efficient Leak Prevention

    Equipped with a drain valve and overflow valve, this design enhances safety by preventing leaks efficiently.

  • Environmentally Friendly

    Supports eco-friendly practices with a sustainable rainwater collection system, promoting water conservation.


Selling Points

  • Efficient and Economical: Offers great value for money while meeting functional demands.

  • Transportability: Lightweight design makes it easy to move and install.

  • Versatile Usage: Ideal for gardens, outdoor spaces, and households, enhancing water management.


Comparasion Table:

FeatureOur ProductCompetitor ProductAdvantage
Capacity100LSimilar capacity, some lowerMeets diverse household needs
MaterialPVC with BHPStandard PVC, some use heavier materialsLightweight and easy to install
DesignFoldable with protective coverStandard design, some non-foldableFoldable for space saving
Ease of UseEasy installation and maintenanceSome products are complex, need extra toolsUser-friendly, reduces complexity
Additional FeaturesOverflow valve and drain outletSome only have a single outletSafer leak prevention design
PriceCompetitively pricedHigher pricing for premium modelsCost-effective, high value for money


Bulk Ordering Information

  • Minimum Order Quantity (MOQ): 100 units

  • Container Capacity: 3,168 sets/20GP, 6,346 sets/40GP

  • Lead Time: 75 days from order confirmation

  • Payment Terms: 100% T/T 30 against B/L

  • FOB Port: Ningbo


Ideal for

  • Gardening Enthusiasts: Perfect for watering plants with collected rainwater.

  • Commercial Landscapers: Reliable bulk orders available for extensive garden projects.

  • Eco-friendly Homes: Supports sustainable water practices.


Packaging Information:

Container/QTY:

Container Capacity: 3,168 sets/20GP, 6,346 sets/40GP

Lead Time: 75 days from order confirmation


Specifications

Size: Diameter 40cm x Height 70cm

Components: 6 support rods, 1 drain valve, 1 faucet, 1 overflow valve

Material: Durable PVC

Packaging: Color Box, 4 units per case