
Precision PRO-961 Laser Level
Key Features
High Accuracy: Achieves leveling accuracy of ±3mm/10m, ensuring precise measurements every time.
Advanced Laser Module: Equipped with a powerful 50mW laser, the PRO-961 operates at wavelengths of 635nm and 520nm.
360-Degree Coverage: Three 360° laser lines provide comprehensive visibility around the workspace.
Durable Construction: Encased in a hardy plastic case, the tool is rated IP54 for protection against dust and water.
Performance
Working Distance: An impressive 30m with the green line laser.
Compensation Range: Leveling compensation range of 3° ±1°, automatically adjusts for minor angle variations.
Operating Conditions: Functions efficiently between -10°C to 50°C, suitable for various environments.
Additional Information
MOQ: 504 units in a color box
Lead Time: 75 days post-order
The Precision PRO-961 stands out in its category with cutting-edge technology, superior endurance, and unrivaled precision. Whether for construction, refurbishing, or any other professional task, this laser level is your ultimate solution.
Packing Information:
Ceiling clip for stable installations
Magnetic bracket for easy attachment to metal surfaces
Durable plastic carrying case for secure transportation
Shipping: FOB from SHA, packaged at 6 pieces per cut case, 60 pieces per container
