Uni Regal Corp. Ltd

中文版

High-Performance, Indoor Leveling with Green & Red Laser Options

The Precision PRO-961 Laser Level is engineered for precise indoor leveling. Offering green and red laser options with a powerful 30 mW output, it delivers top accuracy and reliability. With an IP54 rating, it withstands harsh conditions, making it perfect for professional settings. Ideal for bulk orders and OEM customization.
Description Package Information Inquiry

Key Features

Laser Module Power: 30mW, optimized for accuracy.

Available Wavelengths:

Red Laser: 635nm ±5nm

Green Laser: 520nm ±10nm

Superior Leveling Accuracy: ±3mm/10m ensures precise measurements.

Leveling/Compensation Range: 4° ±1° for flexible angle adjustments.


Optimal Working Distance:

Green Line: 30m

Red Line: 20m

Temperature Resistance: Operates between -10°C to 50°C, ideal for varying indoor environments.

Power Source: 4 x AA batteries (not included).

Durability: IP54 rating for dust and water resistance.


Competitive Edge:

Compared to standard indoor laser levels, the Precision PRO-961 Laser Level offers:

Higher Power Output: 30mW for clearer, more visible laser lines.

Temperature Versatility: Performs well in a wide temperature range, unlike typical models that may falter in extreme conditions.

Reliable Brand Options: Choose trusted brands like OSRAM and QSI/Sharp for unmatched quality and consistency.


B2B Advantages:

Minimum Order Quantity (MOQ): 504 units per color, accommodating bulk purchase needs.

Customization Potential: Options for brand logos and packaging available for OEM clients.


Packing Information:


  • Single Unit Packaging:

    • Contents: Laser level, magnetic bracket, soft bag

    • Carton Dimensions: 6 units per cut case, 24 cases per carton

  • Bulk Packaging:

    • 20GP Container: 27,960 units

    • 40GP/40HQ Container: 55,920 units

  • FOB Port: Guangzhou

  • Lead Time: 15 days