Uni Regal Corp. Ltd

中文版

Precision Tools for Extreme Conditions – Built for Professionals

Condimentum id venenatis a condimentum vitae. Odio pellentesque diam volutpat commodo. Vel eros donec ac odio. Diam sollicitudin tempor id eu nisl. Nunc sed velit dignissim sodales ut eu sem. Facilisi nullam vehicula ipsum a arcu cursus. Quisque non tellus orci ac auctor. Est pellentesque elit ullamcorper dignissim cras tincidunt lobortis feugiat. Consequat id porta nibh venenatis cras sed felis eget velit. Congue eu consequat ac felis donec et.
Description Package Information Inquiry

Key Features Designed for Industrial Use


1. Extreme Environment Reliability

Works in freezing cold (-20°C) and scorching heat (60°C)

IP66-rated – Resistant to heavy rain, dust, and accidental drops

Tested in real-world conditions (See video: Sahara Desert & Arctic job site demonstrations)

Ideal for: Oil rigs, bridge construction, and harsh outdoor projects

2. AI-Powered Accuracy (Patented Tech)

Auto-levels in 2 seconds (vs. 10+ seconds with manual levels)

APP integration – Track calibration history & export reports for compliance

Alerts if surface is unstable – Reduces rework

Precision Comparison:


Manual LevelManual Level
Calibration TimeMargin of Error2 sec
Margin of Error±0.3°±0.3°


3. Superior Visibility & Range

4x brighter beams than standard red lasers (green laser optional)

50m outdoor range with included target card (vs. 30m for competitors)

Pulse mode for increased visibility in strong sunlight

4. Modular Workflow System

Magnetic 360° bracket – Attaches to steel beams for hands-free adjustments

Heavy-duty tripod – Supports 10kg+ for stability in windy conditions

Outdoor target card – Enhances visibility for long-distance leveling


Who Needs This? 

Construction Firms – Perfect for high-rise buildings, road grading, and foundation work

Utility & Telecom – Install power lines and cell towers with precision

Manufacturing Plants – Align heavy machinery and conveyor systems

HVAC & Plumbing – Simplify ductwork and pipeline installations

Bulk order benefits:

Custom branding (laser engraving)

Priority technical support (dedicated engineer assigned)

Discounted accessory bundles


Technical Specifications

ModelModel
Laser TypeGreen (530nm) / Red (650nm)
Self-Leveling Range±5°
Accuracy±0.1° at 10m
Battery8+ hrs (2x 18650 rechargeable)
Warranty3-year industrial warranty


Why Choose Our Laser Level?

  1. Unmatched Durability – IP66 waterproof & dustproof, operates from -20°C to 60°C (-4°F to 140°F)

  2. Smart AI Auto-Calibration – Achieves ≤0.1° precision with self-adjusting technology (no manual tuning needed)

  3. High-Visibility Lasers – Bright green/red beams visible in direct sunlight (up to 50m range)

  4. Modular Accessory System – Includes magnetic 360° bracket, folding tripod, and outdoor target card

  5. Enterprise-Grade Support – Free onsite training & 30-day no-questions-asked returns for bulk orders



Packing Information – Professional Laser Level Kit


Standard Packaging:

Dimensions: 32 x 24 x 15 cm (12.6 x 9.4 x 5.9 in)

Weight: 3.2 kg (7 lbs)

Included in Each Box:

1x Laser Level Unit (PRO-5000X)

1x Magnetic 360° Bracket

1x Heavy-Duty Folding Tripod

1x Outdoor Target Card

2x Rechargeable 18650 Batteries

1x USB-C Charging Cable

1x User Manual (Multilingual)

1x Quick Start Guide

Bulk Order / B2B Packaging Options


Case Pack Quantity for Wholesale:

Small Case: 5 units per master carton

Dimensions: 50 x 40 x 30 cm (19.7 x 15.7 x 11.8 in)

Gross Weight: 18 kg (39.7 lbs)

Pallet Quantity: 80 units per pallet (16 cases)

Dimensions: 120 x 100 x 150 cm (47 x 39 x 59 in)

Gross Weight: 290 kg (639 lbs)

Shipping & Logistics


Export-Ready Packaging:

IP67-rated waterproof inner liner for Sea shipping /air freight protection

Corrosion-resistant anti-static coating on cartons

Fumigation-free plywood pallets (ISPM-15 certified) for international shipments


Custom Packaging Available:

OEM/Private Label: Add your company logo & branding

Kitting: Include branded safety goggles, tool belts, or calibration certificates

Special Requirements? Contact us for custom solutions