Uni Regal Corp. Ltd

中文版

PRO-5000X Industrial Self-Leveling Laser Level

Description Package Information Inquiry

High Precision (±0.1°), IP66 Waterproof, -20°C to 60°C | Bulk & OEM Orders Available

Engineered for Professionals Who Demand Ultra-Accurate & Rugged Performance

The PRO-5000X is an industrial-grade laser level designed for engineers, surveyors, and construction professionals who require extreme precision and reliability in harsh environments.


Key Differentiators vs. Standard Lasers:

  • ±0.1° Ultra-High Accuracy – 3X more precise than typical (±0.3°) laser levels

  • Military-Grade Durability – Works flawlessly from -20°C to 60°C (unlike standard models that fail in extreme temps)

  • IP66 Water & Dustproof – Built for outdoor construction, factories, and cold storage

  • High-Visibility Green Laser – 50m range (100m with detector), superior to red lasers

  • B2B-Focused Features – OEM branding, bulk discounts, and enterprise support


How PRO-5000X Outperforms Standard Models? (vs. Competitor: DEWALT DW088K)

FeatureDEWALT DW088K (Standard Model)PRO-5000X (Industrial-Grade)
Accuracy±0.3°±0.1° (3X precision)
Temp Range0°C to 40°C-20°C to 60°C
DurabilityIP54 (splash-proof)IP66 (fully waterproof & dustproof)
Laser VisibilityRed beam (limited outdoor use)High-power green laser (50m+ range)
B2B OptionsRetail onlyBulk discounts, OEM branding, 3-year warranty


Technical Specifications:

Laser Type: Class II Green Laser (520nm)

Accuracy: ±0.1° at 10m

Self-Leveling: Auto-Calibration (<2 sec)

Working Temp: -20°C to 60°C

Protection Rating: IP66 (fully sealed against dust & water)

Battery: Rechargeable 4000mAh (20+ hours runtime)

Accessories Included:

Heavy-duty tripod

Magnetic wall mount

Laser enhancement glasses

Hard carrying case


Bulk Order Advantages:

Bulk discounts: 15% off for 50+ units

OEM/ODM available – Custom branding & packaging

3-year industrial warranty (vs. standard 1-year)

Dedicated account manager for large orders


Packing Information:


Single Unit Packaging:

Product Dimensions: 12.2 x 6.5 x 4.3 inches (31 x 16.5 x 11 cm)

Weight: 3.3 lbs (1.5 kg)

Included: PRO-5000X laser, tripod, magnetic bracket, glasses, case, manual


Bulk Packaging (50 Units):

Master Carton Dimensions: 24 x 18 x 16 inches (61 x 45 x 40 cm)

Weight per Carton: 55 lbs (25 kg)

Units per Pallet: 200 (4 cartons)

OEM Options: Custom logo, packaging, and documentation