
Glass Scraper Kit - Includes 9 Extra Blades for Professional Cleaning
Glass Scraper Kit - Professional Cleaning Solution with 9 Extra Blades Key Points:
Versatile Surface Use: Ideal for glass, ceramic, and induction stove tops; removes stubborn residues effortlessly.
Efficient Scraping: Perfect for removing window paint, shims, paints, and stickers, restoring surfaces to pristine condition.
Compact and Easy to Use: Designed with an ABS handle featuring an anti-slip TPR grip for comfortable handling.
Auto-Locking Slider: Features two blade positions for easy switching, enabling quick, tool-free blade changes.
Blade Storage: Includes 4 SK5 blades stored within the handle and 4 additional blades in a separate box.
Features:
Perfect for: Glass, ceramic, induction stove tops, cooktops
Effective Removal: Window paint, shims, paints, stickers
Compact Design: Easy to use and store
Blade Change: Quick and tool-free
Glass Scraper Kit – Competitive Analysis (Construction Market Focus)
| Feature | Our Glass Scraper Kit | Plastic Handle | Metal Handle |
| Blade Change | Tool-free, auto-lock slider | Screwdriver required | Screwdriver required |
| Handle Material | ABS + TPR anti-slip grip | Cheap plastic (slippery) | Heavy stainless steel (fatigue) |
| Blade Storage | 4 blades in handle + 4 extra | No storage | No storage |
| Blade Quality | SK5 high-carbon steel | Low-grade stainless | Standard stainless |
| Weight & Durability | Lightweight yet tough | Flimsy | Heavy |
| Construction Use | Heavy-duty, resists paint/grout | Cracks under pressure | Rust-prone |
Product Description
Experience exceptional cleaning performance with our Glass Scraper Kit, engineered for professional-grade removal of tough residues.
The scraper features a durable stainless iron cover and an ergonomic ABS handle for optimal control and ease of use.
Tackle challenges like removing window paint and old adhesives with utmost efficiency. The auto-locking slider mechanism allows quick, tool-free blade replacements, ensuring you stay ahead of any cleaning task.
With its compact design and extra SK5 blades, this versatile tool is ready to assist both household and professional users. A must-have for
achieving outstanding cleaning results swiftly and effectively.
FAQ:
Q: Is this scraper durable for professional use?
A: Yes! Unlike flimsy plastic scrapers, ours has a stainless iron cover + ABS handle for long-term durability.
Q: Does it come with extra blades?
A: Yes! Includes 9 SK5 high-carbon steel blades (4 in handle + 4 in box + 1 pre-installed), unlike competitors with cheap, dull blades.
Q: Is the handle comfortable for long use?
A: Absolutely! The anti-slip TPR grip prevents hand fatigue, unlike hard plastic or slippery metal handles.
Q: Can I change blades quickly?
A: Yes! Our auto-locking slider allows tool-free blade swaps in seconds, unlike models requiring screwdrivers.
Q: Is this suitable for commercial/wholesale buyers?
A: Yes! We offer B2B bulk packaging (24 units/carton) with competitive MOQ (500 units) and fast lead times (15 days).
Q: Do you offer bulk discounts for contractors?
A: Yes! We provide wholesale pricing (MOQ 500 units, 24/carton) and custom branding for construction suppliers.
Q: How fast can I change blades on a job site?
A: Instantly! Our auto-locking slider lets workers swap blades without tools, saving time vs. screwdriver-dependent models.
Q: Are the blades replaceable in bulk?
A: Yes! We supply SK5 blades in bulk (100/pack)—sharper and longer-lasting than standard stainless steel.
Q: Will the handle break under heavy use?
A: No! The reinforced ABS + TPR grip withstands daily abuse, unlike cheap plastic competitors.
Why Choose Our Scraper:
Durability: Holds up against paint, grout, and adhesives.
Efficiency: Tool-free blade changes keep crews working.
Bulk Savings: Optimized for high-volume procurement.
Grip Safety: Anti-slip handle reduces fatigue during long shifts.
Packaging Information:
Container/QTY:
480 sets/20GP
1080 sets/40GP
2000 sets/40HQ
Packaging:
1 set/double blister card
24 sets/PDQ carton
Case Pack: 24 units
