Uni Regal Corp. Ltd

English

Professional Tool Kit – Built for Demanding Workshops & Factories

Industrial-grade 72-piece anti-corrosion tool kit with triple-coated Cr-V steel and modular RFID-tracked foam packaging, available for OEM/wholesale. Shipping capacity: 1,200 sets per 40HQ container.
Description Package Information Inquiry

Premium Tool Kit – Engineered to Outperform & Outlast Competitors

Industrial-Grade Durability – Made from Chrome Vanadium Steel (HRC 58-60), resistant to rust & wear (proven in 1500+ hour salt spray tests)

10-Year No-Rust Warranty – 3x longer than standard tool kits

72-Piece Professional Set – Covers 150+ automotive & mechanical applications

ast Bulk Order Fulfillment – MOQ 50+ kits | Lead time ≤72 hrs


Exclusive B2B Perks (Wholesale & OEM Buyers)

  • Volume Discounts – Save up to 33% on 500+ units

  • Free Custom Branding – Laser engraving, packaging, foam inserts

  • Dedicated Support – 1-on-1 procurement specialist


Problem-solution comparison in a table format

Common ComplaintsOur Premium SolutionProof/Technical Detail
"Tools rust in months"Lab-Certified Anti-Corrosion CoatingSalt spray tested for 1,500+ hours (vs. 300hr industry avg)
"Missing pieces in box"Barcode-Checked Packaging99.9% accuracy rate (automated QC scans
"Poor grip causes hand fatigue"Patented ErgoGrip™ Handles40% reduced pressure points (biomechanical lab report available)
"Wobbly sockets strip bolts"Laser-Calibrated Tolerance (±0.01mm)ISO 9001-certified machining
"No bulk order support"MOQ 50 Kits + Volume DiscountsFree engraving on 500+ units


Side-by-Side Comparison (vs. Generic Brands)

FeatureOur Tool KitCompetitors
Steel QualityChrome Vanadium (ASTM-certified)Low-carbon steel (prone to chipping)
Warranty10 years1-2 years
MOQ Flexibility50 kits (B2B-friendly)100-200 kits (rigid)



B2B-Only Incentives (Apply Now)

Free Sample – For verified businesses (survey required)

Dealer Portal Access – Real-time inventory & tiered pricing

Custom Documents – Pre-filled COO, SDS, HS codes


Limited-Time Offer

Next container ships soon – Lock in 2025 pricing before tariffs change!


Key Packaging:

  • FOAM LAYOUT – Shadow foam prevents movement during transit

  • PALLET OPTIONS – Stackable up to 6 layers (saves 40% shipping Cost)

  • RETAIL READY – PVC case with hang holes for Pepco/Walmart compliance

  • DOCUMENTATION – Includes COO, test reports, and multi-language SDS sheets


Logistics Optimization:

  • 20'GP: 650 sets (Gross weight: 14.5MT / Volume: 28CBM)

  • 40'HQ: 1,200 sets (Gross weight: 22MT / Volume: 68CBM)

  • Pallet Specs: 1.2m×1m×1.8m (50 sets/pallet, stackable up to 5 layers)

  • Port-Friendly: Built-in forklift slots + marine-grade moisture barrier wrapping

(Note: Figures include 5% safety margin. Capacity can be increased by 7% with hanging transport configuration.)