Uni Regal Corp. Ltd

English

Complete Power Tool Set with Tool Bag

Invest in the power and flexibility that ensure your on-site success. Inquire now about bulk orders for tailored solutions and corporate benefits.
Description Package Information Inquiry

Product Overview

Equip your team with the versatile 20V Power Tool Set, designed to elevate productivity and efficiency on any worksite. Engineered for contractors and procurement managers, our kit offers durability, adaptability, and performance that stand apart in competitive environments.


Key Components

1PC 20V 1/4" Impact Screwdriver:

  • Max Torque: 180N.m for extreme fastening power.

  • Speed Range: 0-2400 RPM; Impact Frequencies: 0-4800 BPM for rapid operation.

1PC 20V Cordless Brushless Drill:

  • Max Torque: 35N.m with torque settings 24+1 for versatility across tasks.

  • Speed Options: Dual speed control from 0-450/1500 RPM for precision drilling.

2PC 2000mAh Batteries: Ensures consistent power delivery and longer runtime for uninterrupted work.

  • Desktop Charger: Fast and efficient charging for minimal downtime.

  • Durable Nylon Bag: Organize and transport your tools hassle-free.


Competitive Differentiation

Built for Tough Conditions

  • Brushless Motor Technology: Offers superior efficiency and two times the lifespan of conventional brushed motors.

  • Optimal Torque & Speed: Handles demanding tasks effortlessly, from heavy-duty fastening to intricate drilling.

Procurement Advantage

  • Bulk Discounts: Available for orders over MOQ 600, offering cost-effective solutions for business scaling.

  • Custom Branding: Make this kit your own with logo engraving options for corporate identity.

Enhanced User Experience

  • Ergonomic Design: Reduced vibration for comfort during prolonged use.

  • Quick Switch: Easy bit changes to maximize workflow efficiency.


General Specifications:

Battery Type: 2000mAh Lithium

Charging Time: 90 minutes

Tool Bag Material: Durable Nylon

Standard Package Includes:

1× Impact Screwdriver

1× Cordless Brushless Drill

2× Lithium-Ion Batteries

1× Desktop Charger

1× Nylon Tool Bag


Packing Specs (Bulk Orders):

Container/QTY 1x20: As specified

Container/QTY 1x40HQ: As specified

Packaging Type: 1 set/Color box