Uni Regal Corp. Ltd

English

Professional 16V Brushless Drill Kit

ProSeries X9 Heavy-Duty Rotary Hammer Drill drives 8.5J impact energy through concrete/rebar—20% faster than Hilti TE-2. Sync usage to Procore/Trimble via QR code, get 22% off fleet orders (with free asset tags), and rely on 110V/220V batteries with 90-minute charging for zero downtime.
Description Package Information Inquiry

Key Selling Points:

  • Brushless Motor Technology - 30% more efficient & 2X longer lifespan than brushed motors

  • Dual-Speed Control (0-420 RPM / 1350 RPM) - Perfect for delicate tasks AND heavy-duty applications

  • 35N.m Max Torque - Drills through hardwood, metal & masonry with ease

  • Smart LED Battery Indicator - Never run out of power mid-job

  • All-in-One Professional Kit - Includes 18 essential hand tools (valued at $XX separately)


Technical Specifications 

FeatureSpecification
Motor TypeBrushless (Cooler Operation + Less Maintenance)
Voltage16V Lithium-Ion (20% More Runtime vs Standard 12V)
No-Load Speed0-420 RPM (Low) / 1350 RPM (High)
Max Torque35N.m (Ideal for lag bolts & dense materials)
Battery18-Piece Pro-Grade Accessory Set
Included Tools18-Piece Pro-Grade Accessory Set
Warranty3-Year Commercial Warranty


Why Choose Our Heavy-Duty Construction Drill? 

For General Contractors & Crew Leaders

  • Jobsite Tough – IP54-rated casing withstands concrete dust, driving rain, and 6 ft. drops (exceeds MIL-STD-810G standards)

  • Ergonomic Dominance – 30% less vibration + heated-grip option for cold-weather work (OSHA-compliant for 12-hour shifts)

  • Hyper-Efficient – Quick-change SDS chuck swaps bits in 3 sec, even with gloves (saves 11 min/hour vs. competitors)


For Procurement & Fleet Managers

  • Scale Savings – 22% off orders of 25+ units (with free asset tagging)

  • White-Glove Branding – Laser-engraved company logos/QR codes (traceability + lost-tool recovery)

  • Flex Warranties – Choose 1-3 year coverage (incl. loaners during repairs)


For Civil Engineers & GCs

  • BIM-Ready – Tool syncs with Procore/Autodesk for usage tracking & maintenance alerts

  • Global Voltage – 110V/220V switchable + EU/UK plug adapters (no downtime overseas)

  • Cross-Industry Perks (Retailers/DIY Included)

  • Free Training Hub – Access exclusive video libraries:


Contractors: OSHA-compliant rotary hammer courses ($299 value)

DIYers: 10+ weekend project tutorials (e.g., deck building, tile drilling)

Expandable Ecosystem – Fits 50+ attachments (from rebar cutters to diamond cores)


Package Includes:

1× Heavy-Duty Drill (IP54-rated)

2× 5.0Ah Lithium Batteries (220V/110V auto-switch)

1× SDS-Plus Quick-Change Chuck

1× EU/UK Voltage Adapter Set


Printed Materials:

OSHA-QuickStart Safety Guide (6 languages)

BIM Compatibility QR Code (Links to Procore/Trimble Setup)

Dimensions: 18" x 12" x 8" (45.7×30.5×20.3cm) | Weight: 14.3 lbs (6.5kg)

Shipping Note: Pallet-friendly (40 units/pallet w/custom branding options)