
Uni Regal 20V Cordless Drill Kit – Your Reliable Choice for DIY and Professional Use
Detailed Description:
The Uni Regal 20V Cordless Drill Kit is a versatile and powerful tool designed to meet a wide range of drilling and fastening needs. Whether you're tackling home improvement projects, assembling furniture, or engaging in more professional construction work, this drill delivers excellent performance and reliability.
Technical Specifications:
Voltage: 20V
Max Torque: 32N.m
Two-Speed Settings: 0-400/1350rpm
Chuck Size: 0.8mm -10mm (1/32"-3/8")
Motor: 550 Motor
Voltage: 220V, 50Hz (Charger compatible with 100-240V~)
Torque Settings: 17+1
Kit Includes:
1 x Uni Regal 20V Cordless Drill
2 x 20V * 1500mAh Batteries (Extended Run Time)
1 x Charger (100-240V~, 50/60Hz 0.4A)
6 x 50mm Screwdriver Bits (For Various Screw Types)
6 x Drill Bits (3 for Metal, 3 for Wood – Covers Common Drilling Needs)
9 x 1/4“ Carbon Steel Sockets (For Tightening Nuts and Bolts)
1 x Socket Adapter (Extends Socket Usability)
1 x Magnetic Bit Holder (Quick Bit Changes, Convenient Operation)
1 x Flexible Extension Shaft (Reaches into Tight Spaces)
Selling Points (Highlighting User Benefits):
Two-Speed Settings for Precise Control: Easily switch between speeds to achieve the best results for different tasks.
LED Light Illuminates Your Work Area: Work accurately even in dimly lit environments, improving efficiency.
17+1 Torque Settings: Prevents over-tightening of screws, protecting materials.
Powerful Performance and Durable: 32N.m of maximum torque and a reliable motor ensure this drill can handle various tasks.
Value-Packed Kit, All in One: Includes 28 accessories, eliminating the need for additional purchases, saving time and effort.
Usage Scenarios:
Home Improvement (Hanging Pictures, Installing Lights, Assembling Furniture)
DIY Projects (Woodworking, Repairing Items)
Professional Use (Construction, Equipment Maintenance)
Package Dimensions: 12 x 10 x 8 inches
Weight: 5 lbs
Packaging: Comes in a durable, reusable carry case for easy storage and transport
