Uni Regal Corp. Ltd

English

Air Drain Blaster - Professional Drain Cleaning Tool

The Air Drain Blaster is a high-pressure, chemical-free drain cleaning tool that instantly clears clogs in sinks, showers, and tubs using powerful air bursts—no plunging, snakes, or toxic chemicals required.
Description Package Information Inquiry

Air Drain Blaster Key Features & Benefits:

  • Powerful Air Pressure Technology

Delivers 5x more force than standard plungers

Instantly clears hair, grease, and debris blockages

No harsh chemicals - safe for all pipes (PVC, metal, septic systems)


  • Universal Drain Compatibility

Works on kitchen sinks, bathroom drains, showers & tubs

Fits standard 1.25" to 2" drain openings (includes adapters)


  • Industrial-Grade Durability

Reinforced ABS/PVC construction withstands repeated use

Thicker rubber seal prevents air leaks (20% wider than competitors)


  • Ergonomic & Easy to Use

One-hand operation - just press and release

No tools required - sets up in seconds

Compact design for easy storage


How It Works (Simple 3-Step Process)

1️. lace over drain (ensure tight seal)

2️. Pump 3-5 times to build pressure

3️. Release to blast away clogs

Tip: For tough blockages, pour hot water first to soften debris


Technical Specifications

  • Material: High-density ABS body + PVC hose

  • Color: Professional red/black design

  • Included: Main unit, 2 drain adapters (1.25" & 2"), user manual

  • Warranty: 2-year manufacturer guarantee

Why Choose Our Air Drain Blaster?

FeatureAir Drain BlasterChemical CleanersTraditional PlungersDrain Snakes 
EffectivenessClears in 1-3 pumpsMay require multiple usesOften needs repeated plungingCan miss debris
Pipe SafetyZero damageCorrodes pipes over timeSafe but can loosen jointsRisks scratches
HygieneNo splashbackToxic fumesSplashes dirty waterHand-contact required
Ease of Use3-step operationWaiting time requiredPhysical effort neededDisassembly needed
Eco-Friendly100% chemical-freeToxic runoffSafe but wasteful water useMetal waste

Key Advantages:
Faster than plungers & chemicals
Safer than snakes & corrosive cleaners
Cleaner than traditional methods

How to unclog a drain without chemicals.png


Customer Concerns Addressed (FAQ)


Q: Will this work on completely blocked drains?

A: For severe clogs, we recommend:

  • Pour boiling water to soften blockage

  • Use short, rapid pumps (3-5 bursts)

  • Repeat if needed


Q: Why does air sometimes escape?

A: Solution:

  • Wet the rubber seal slightly before use

  • Apply downward pressure while pumping

  • Our upgraded 2024 model features a thicker gasket


Q: Is this safe for garbage disposals?

A: Yes! Unlike chemicals, it won't damage disposal blades.


Q: What's your return policy?

A: 100% satisfaction guarantee - contact us within 30 days if unsatisfied.



Packaging Information:

Packing: 1 PC/Color Box, 6 PCS/Cut Case/Master

MOQ: 100 PCS