Uni Regal Corp. Ltd

English

Glass Scraper Kit - Includes 9 Extra Blades for Professional Cleaning

Professional Glass Scraper Kit with tool-free blade change, anti-slip TPR grip, and built-in SK5 steel blade storage—perfect for construction, contractors, and B2B bulk buyers seeking durable, high-performance scraping tools.
Description Package Information Inquiry

Glass Scraper Kit - Professional Cleaning Solution with 9 Extra Blades Key Points:

  • Versatile Surface Use: Ideal for glass, ceramic, and induction stove tops; removes stubborn residues effortlessly.

  • Efficient Scraping: Perfect for removing window paint, shims, paints, and stickers, restoring surfaces to pristine condition.

  • Compact and Easy to Use: Designed with an ABS handle featuring an anti-slip TPR grip for comfortable handling.

  • Auto-Locking Slider: Features two blade positions for easy switching, enabling quick, tool-free blade changes.

  • Blade Storage: Includes 4 SK5 blades stored within the handle and 4 additional blades in a separate box.

Features:

  • Perfect for: Glass, ceramic, induction stove tops, cooktops

  • Effective Removal: Window paint, shims, paints, stickers

  • Compact Design: Easy to use and store

  • Blade Change: Quick and tool-free


Glass Scraper Kit – Competitive Analysis (Construction Market Focus)

FeatureOur Glass Scraper KitPlastic HandleMetal Handle
Blade ChangeTool-free, auto-lock sliderScrewdriver requiredScrewdriver required
Handle MaterialABS + TPR anti-slip gripCheap plastic (slippery)Heavy stainless steel (fatigue)
Blade Storage4 blades in handle + 4 extraNo storageNo storage
Blade QualitySK5 high-carbon steelLow-grade stainlessStandard stainless
Weight & DurabilityLightweight yet toughFlimsyHeavy
Construction UseHeavy-duty, resists paint/groutCracks under pressureRust-prone


Product Description

  • Experience exceptional cleaning performance with our Glass Scraper Kit, engineered for professional-grade removal of tough residues. 

  • The scraper features a durable stainless iron cover and an ergonomic ABS handle for optimal control and ease of use.

  • Tackle challenges like removing window paint and old adhesives with utmost efficiency. The auto-locking slider mechanism allows quick, tool-free blade replacements, ensuring you stay ahead of any cleaning task.

  • With its compact design and extra SK5 blades, this versatile tool is ready to assist both household and professional users. A must-have for 

    achieving outstanding cleaning results swiftly and effectively.


FAQ:

Q: Is this scraper durable for professional use?

A: Yes! Unlike flimsy plastic scrapers, ours has a stainless iron cover + ABS handle for long-term durability.

Q: Does it come with extra blades?

A: Yes! Includes 9 SK5 high-carbon steel blades (4 in handle + 4 in box + 1 pre-installed), unlike competitors with cheap, dull blades.

Q: Is the handle comfortable for long use?

A: Absolutely! The anti-slip TPR grip prevents hand fatigue, unlike hard plastic or slippery metal handles.

Q: Can I change blades quickly?

A: Yes! Our auto-locking slider allows tool-free blade swaps in seconds, unlike models requiring screwdrivers.

Q: Is this suitable for commercial/wholesale buyers?

A: Yes! We offer B2B bulk packaging (24 units/carton) with competitive MOQ (500 units) and fast lead times (15 days).

Q: Do you offer bulk discounts for contractors?

A: Yes! We provide wholesale pricing (MOQ 500 units, 24/carton) and custom branding for construction suppliers.

Q: How fast can I change blades on a job site?

A: Instantly! Our auto-locking slider lets workers swap blades without tools, saving time vs. screwdriver-dependent models.

Q: Are the blades replaceable in bulk?

A: Yes! We supply SK5 blades in bulk (100/pack)—sharper and longer-lasting than standard stainless steel.

Q: Will the handle break under heavy use?

A: No! The reinforced ABS + TPR grip withstands daily abuse, unlike cheap plastic competitors.


Why Choose Our Scraper:

  • Durability: Holds up against paint, grout, and adhesives.

  •  Efficiency: Tool-free blade changes keep crews working.

  • Bulk Savings: Optimized for high-volume procurement.

  • Grip Safety: Anti-slip handle reduces fatigue during long shifts.

Packaging Information:

Container/QTY:

  • 480 sets/20GP

  • 1080 sets/40GP

  • 2000 sets/40HQ

Packaging:

  • 1 set/double blister card

  • 24 sets/PDQ carton

Case Pack: 24 units